| Location: | Utah |
|---|---|
| Posted: | Oct 6, 2025 |
| Due: | Oct 24, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GC10017 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will consist of the construction of infrastructure, earthwork and roadways to serve approximately 116 future affordable housing units at the Arroyo Crossing community land trust subdivision. Specific project improvements include the excavation and construction of two roadways and installation of water, sewer, and irrigation mains, trenching and installation of electrical conduit, and a storm drainage system. The approximate project area is 4.8 acres. Gas utility is not proposed as part of this project. See RFB doc for full details and engineering plans.

With GovernmentContracts, you can:
...Project: Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf ...
State Government of Utah
Bid Due: 9/30/2026
...walk, ramps, and flatwork, addition of plantings, and modifications of existing irrigation and ...
State Government of Utah
Bid Due: 9/30/2026
...and irrigation improvements at West Haven City Windsor Park, including grading, concrete and ...
West Haven city
Bid Due: 9/30/2026
...AND SEWAGE TREATMENT EQUIPMENT NAICS Code: 221310 - Water Supply and Irrigation Systems ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/25/2026