Walkway Replacement

Location: Massachusetts
Posted: Mar 4, 2026
Due: Mar 19, 2026
Agency: Commonwealth of Massachusetts
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: BD-22-1221-MOD00-MOD-125935
Publication URL: To access bid details, please log in.
Header Information
Bid Number:
BD-22-1221-MOD00-MOD-125935
Description:
Walkway Replacement
Bid Opening Date:
03/19/2026 02:00:00 PM
Purchaser:
Trent Carter
Organization:
New Bedford Housing Authority
Department:
MOD001 - Modernization
Location:
MOD - Modernization Office
Fiscal Year:
22
Type Code: Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
03/04/2026 08:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
A Pre-bid conference shall be held on Wednesday March 11, 2026, at 9:00 am. The meeting will begin at 99 Griffin Circle Street, New Bedford, MA 02740.
Bulletin Desc:
installation of erosion control measures and tree protection; saw cutting of asphalt
and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas;
disposal of excavated material; remove and reset curbing; furnish and install new precast concrete &
granite curb; installation of root barrier; tree root pruning, preparing the walkway subgrade; concrete and
subgrade material testing; protection of work; loam and seed areas; and construction of concrete walkways
Ship-to Address:
Trent Carter - Office of Modernization
New Bedford Housing Authority
128 Union Street; 4th Floor
New Bedford , MA 02740
US
Email: trent.carter@nbha-ma.org
Phone: (508) 997-4852
Bill-to Address:
Trent Carter - Office of Modernization
New Bedford Housing Authority
128 Union Street; 4th Floor
New Bedford , MA 02740
US
Email: trent.carter@nbha-ma.org
Phone: (508) 997-4852
Print Format:
Bid Print

File Attachments:
logo.doc
Bay Village Walkways Phase IV

Form Attachments:
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
17

)



installation of erosion control measures and tree protection; saw cutting of asphalt
and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas;
disposal of excavated material; remove and reset curbing; furnish and install new precast concrete &
granite curb; installation of root barrier; tree root pruning, preparing the walkway subgrade; concrete and
subgrade material testing; protection of work; loam and seed areas; and construction of concrete
walkways and ADA accessible ramps areas throughout the development.

U N S P S C Code:
72-13-17
Infrastructure construction

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.