Water Storage Tank and Foundation Construction Project, Nunam Iqua, AK

Location: Alaska
Posted: Mar 30, 2026
Due: Apr 28, 2026
Agency: ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Type of Government: State & Local
Category:
  • 54 - Prefabricated Structures and Scaffolding
  • Y - Construction of Structures and Facilities
Solicitation No: IFB #ANTHC 26-B-13184
Publication URL: To access bid details, please log in.
Project: Water Storage Tank and Foundation Construction Project, Nunam Iqua, AK
Ref. #: IFB #ANTHC 26-B-13184
Type: IFB
Status:
Open
Open Date: Mar 18th 2026, 12:00 AM AKDT
Questions Due Date: Apr 14th 2026, 11:30 PM AKDT
Contact Information: Annie Messer; Kris Vnuk, DEHECDTContract@anthc.org
Close Date: Apr 28th 2026, 10:00 AM AKDT

Project Description: Project Description: Construct 350,000 gallon water storage tank and platform. Install fill/draw lines, additional heat add for new tank, and supplemental chlorination point. Upgrade raw water monitoring to include turbidity and conductivity. Construct an alarm using the monitoring that would alert an operator to turn off the raw water pump and pause water treatment until raw water quality drops to acceptable total dissolved solids levels.
Work of the Project includes the following:
• Phase 1: Mobilization, Construction Survey, Erosion and Pollution Control, Water Storage Tank Foundation & Water Main Foundation, De-mobilization.
• Phase 2: Mobilization, Erosion and Pollution Control, Water Treatment Plant Upgrades, Water Storage Tank and Valve Vault, Furnish and Install 6X12 Water Main & Furnish and Install 4X12 Water Main, De-mobilization.
The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with water storage tank construction.
Anticipated Schedule:
The Project has an expected substantial completion date of 9/30/2027 and final completion date of 11/30/2027.
Award Statement:
Award will be based on the total of Phase 1 and Phase 2; however initial award may be for Phase 1 with Phase 2 added at later date via modification. This may occur should bid prices exceed available funding and allow time to obtain supplemental funding for Phase 2. It is the intent of ANTHC for the entire project to be completely constructed by a single contractor.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Research Center, Baler Facility, Borough Landfill, and Leachate Treatment plant. There... Permit AK0053481 ...

Kodiak Island Borough

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.