| Location: | Georgia |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Apr 6, 2026 |
| Agency: | City of Sandy Springs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-044 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project involves the installation of Centrifugally Cast Concrete Pipe (CCCP) to approximately 90 linear feet (LF) of 60" Corrugated Metal Pipe (CMP), removal and installation of the downstream headwall, installation of stream bed protection in the downstream section, installation of black coated handrail, site grading, and erosion control.

With GovernmentContracts, you can:
..., erosion control and all other work and all appurtenances required. Purchase Plans ...
G. Ben Turnipseed Engineers
Bid Due: 11/05/2026
..., electrical, mechanical work, painting, grassing, erosion control and all other work and ...
G. Ben Turnipseed Engineers
Bid Due: 11/05/2026
..., erosion control and all other work and all appurtenances required. Purchase Plans ...
G. Ben Turnipseed Engineers
Bid Due: 11/05/2026
...adjustments, erosion control, and traffic management. The project aims to improve pedestrian safety...
City of Sandy Springs
Bid Due: 11/13/2026