| Location: | Georgia |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Apr 6, 2026 |
| Agency: | City of Sandy Springs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-044 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project involves the installation of Centrifugally Cast Concrete Pipe (CCCP) to approximately 90 linear feet (LF) of 60" Corrugated Metal Pipe (CMP), removal and installation of the downstream headwall, installation of stream bed protection in the downstream section, installation of black coated handrail, site grading, and erosion control.

With GovernmentContracts, you can:
...Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. 98814 Erosion Control Services... 98832 ...
State Government of Georgia
Bid Due: 7/28/2026
...water line, all work complete with appurtenances, including traffic control, striping and erosion ...
G. Ben Turnipseed Engineers
Bid Due: 8/13/2026
..., materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures... grading, ...
State Government of Georgia
Bid Due: 8/25/2026
..., and insurance necessary to complete the work and shall provide erosion control, ...
State Government of Georgia
Bid Due: 8/17/2026