| Location: | California |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Apr 1, 2026 |
| Agency: | City of Vista |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: City of Vista W. Bobier Drive Complete Streets Project (CIP 8374)
Addenda: 0
Release Date: 3/5/2026
Due Date: 4/1/2026
The City of Vista is requesting proposals from teams composed of a qualified engineering firm to provide professional services for design surveying, underground utility survey, geotechnical investigation, engineering, roadway design, construction staking, construction material testing, and construction support for the W. Bobier Drive Complete Streets Project.
The City of Vista received a SANDAG Smart Growth Incentive Program (SGIP) grant for the W. Bobier Drive Complete Streets Project. The project generally consists of a partial road diet and bike lane improvements between Marabou Lane and N. Santa Fe Avenue, construction of roundabouts at W. Knapp Drive and Dorsey Way, along with new pedestrian crossings, raised medians and new street lighting.

With GovernmentContracts, you can:
...currently under construction. The existing plant was taken out of service in October ...
Padre Dam Municipal Water District
Bid Due: 7/02/2026
..., including preconstruction surveys, construction monitoring, environmental compliance activities...; and construction of a ...
City of Victorville
Bid Due: 6/23/2026
...professional design services to prepare bid documents (Plans, Specifications and Construction Estimate... and ...
City of Rohnert Park
Bid Due: 6/26/2026
...Construction Place of Performance: El Centro , CA USA Description The project includes ...
DEPT OF DEFENSE
Bid Due: 6/16/2026