| Location: | Georgia |
|---|---|
| Posted: | Jun 11, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66591-NONST-2026-000000004 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66591-NONST-2026-000000004 | FY 2025 GTIB Resurfacing Project Phase 1 | Iron City, Town Of |
Jun 11, 2026 @ 01:52 PM
|
Jul 14, 2026 @ 11:00 AM
|
Start Date: Jun 11, 2026 @ 01:52 PM ET
End Date:
Jul 14, 2026 @ 11:00 AM ET
Sealed Bids for the construction of the FY 2025 GTIB Resurfacing Project Phase 1 will be received, by Town of Iron City, at the 115 N Church St, Iron City, GA 39859, until 11:00 AM, Tuesday, July 14, 2026, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2025 GTIB Resurfacing Project Phase 1 as shown on the construction drawings. In general, construction consists of resurfacing approximately ± 0.4 miles of roadway and all associated measures for the complete project. Time allotted for completion of work is 30 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 45 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Copies of Bidding Documents for bidding purposes can be obtained from Watkins & Associates, L.L.C., 1606 Whiddon Mill Road, Tifton, Georgia 31793, Phone: (229) 388-8823, (Office of the Engineer) upon payment of $300.00 for each set (non-refundable). Prospective Bidders may examine the Bidding Documents at the Town of Iron City, located at 115 N Church St, Iron City, GA 39859 or at Watkins & Associates, LLC on Mondays through Fridays between the hours of 8 A.M. and 5 P.M. Upon request and receipt of the document payment indicated above, Watkins & Associates, LLC will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted will be considered the prospective Bidder¿s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Engineer. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents.
| Code | Description |
| 91276 | Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc. |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
| 91395 | Paving and Resurfacing, Highway and Road |
Stacy Watkins
admin@watkinseng.com
2293888823
Advertisement for Bids
Section 00111
TOWN OF IRON CITY
FY 2025 GTIB RESURFACING PROJECT PHASE 1
ADVERTISEMENT FOR BIDS
PART 1 GENERAL
1.01. COMPETITIVE COST SEALED BIDS
Sealed Bids for the construction of the FY 2025 GTIB Resurfacing Project Phase 1 will
be received, by Town of Iron City, at the 115 N Church St, Iron City, GA 39859, until
11:00 AM, Tuesday, July 14, 2026, local time, at which time the Bids received will be
publicly opened and read. No bid may be withdrawn after the closing time for receipt of
bids for a period of sixty (60) days.
1.02. CONTRACTOR LICENSE
Any Contractor submitting a bid must be a pre-qualified Georgia Department of
Transportation Contractor. License numbers must be written on the face of the bid
envelope. No bid will be opened unless the license number is clearly shown. See
Instructions to Bidders for additional bidding requirements.
1.03. SCOPE OF WORK
The work to be done shall consist of furnishing all labor, materials and equipment
necessary to construct the proposed FY 2025 GTIB Resurfacing Project Phase 1 as
shown on the construction drawings. In general, construction consists of resurfacing
approximately 0.4 miles of roadway and all associated measures for the complete project.
Time allotted for completion of work is 30 consecutive calendar days to substantial
completion. Work shall be complete and ready for contract close-out with 45 consecutive
calendar days. All work shall be completed in accordance with the plans and specifications.
The work will be awarded in one (1) Contract.
1.04. PLANS AND BIDDING DOCUMENTS
Copies of Bidding Documents for bidding purposes can be obtained from Watkins &
Associates, L.L.C., 1606 Whiddon Mill Road, Tifton, Georgia 31793, Phone: (229) 388-
8823, (Office of the Engineer) upon payment of $300.00 for each set (non-refundable).
Prospective Bidders may examine the Bidding Documents at the Town of Iron City,
located at 115 N Church St, Iron City, GA 39859 or at Watkins & Associates, LLC on
Mondays through Fridays between the hours of 8 A.M. and 5 P.M. Upon request and
receipt of the document payment indicated above, Watkins & Associates, LLC will
transmit the Bidding Documents via delivery service. The date that the Bidding
Documents are transmitted will be considered the prospective Bidder's date of receipt of
the Bidding Documents. Partial sets of Bidding Documents will not be available from the
Engineer. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding
Documents, including Addenda if any, obtained from sources other than the Office of the
Engineer.
Town of Iron City, Georgia W&A Project No.: W1005-025-01
FY 2025 GTIB Resurfacing Project Phase 1 01200-1
Advertisement for Bids
Section 00111
1.05. REQUESTS FOR INFORMATION
Plan holders list, addenda and bid results are available at www.watkinseng.com.
1.06. PREQUALIFICATION OF BIDDERS
Prequalification may be required of Bidders prior to the award of contract. At the Owner's
request, detailed written evidence such as financial data, bonding capacity, previous
experience, present commitments, and other such data may be necessary to assist Owner
in determining Contractor's qualifications shall be provided per the Instructions to Bidders
contained in the contract documents.
1.07. BONDS
All bid forms must be accompanied by a Bid Bond or a certified cashier's check in an
amount not less than ten percent (10%) of the amount bid. All bonds shall be by a surety
company licensed in Georgia with "A" minimum rating performance and financial strength
of at least five (5) times the contract price as listed in the most current publication of "Best's
Key Rating Guide Property Liability". The successful bidder, if awarded the Contract, will
be required to furnish a Performance Bond and Payment Bond, each in the amount of one
hundred percent (100%) of the Contract amount. All bonds must appear on the Treasury
Department's most current Circular 570 Listing. Each Bond shall be accompanied by a
"Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to
include the date of the bond.
1.08. GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
All qualifying Contractors and Subcontractors performing work with the Town of Iron
City must register and participate in the federal work authorization program commonly
known as E-Verify, or any subsequent replacement program, to verify the work eligibility
information of new employees. In order for a Bid to be considered, it is mandatory that the
Bidder's Affidavit of Compliance with O.C.G.A. 13-10-91 be completed and submitted
with the Bid.
1.09. FUNDING SOURCES
Any Contract or Contracts awarded under this Advertisement for Bids will be funded by a
grant from the Georgia Transportation Infrastructure Bank.
1.10. RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids, including without limitation, the rights
to reject any or all nonconforming, nonresponsive, unbalanced, or conditional Bids and to
reject the Bid of any Bidder if Owner believes that it would not be in the best interest of
the Project to make an award to that Bidder, whether because the Bid is not responsive or
the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent
standard or criteria established by the Owner. Owner reserves the right to waive
informalities and to re-advertise.
Owner: Town of Iron City By: Zack Conoly Title: Mayor
END OF SECTION
Town of Iron City, Georgia W&A Project No.: W1005-025-01
FY 2025 GTIB Resurfacing Project Phase 1 01200-2

With GovernmentContracts, you can:
...Bid # Bid/Proposal Name Pre-Bid/Pre-Proposal Bid/Proposal Opening Bid Tabulation ITB 27-006 Speed Table ...
City of Albany
Bid Due: 8/17/2026
...Natural Gas Pipeline Construction (PDF, 7MB) 08/18 09/16/2026...
City of Albany
Bid Due: 9/16/2026
...RFQ for Engineering and Construction Services Development Authority Of Dawson County Aug 07, ...
State Government of Georgia
Bid Due: 9/07/2026
...26-181 Construction Svcs for May Park Improvements Available Date: 7/23/2026 Due Date: 8/18/2026... ...
https://www.augustaga.gov/
Bid Due: 8/18/2026