Addendum No. 01
City of Fort Morgan Wastewater Treatment Facility (WWTF)
Expansion Project – Bid Package
TO: All Holders of Bidding and Contract Documents
DATE: May 22, 2026
The following changes, additions, and/or deletions are hereby made part of the Bidding and
Contract Documents for the Construction of the Wastewater Treatment Facility Expansion – Bid
Package.
Questions
Addendum
Number
AD1-1
Section – Name,
Article, Page
Question and Answer
Contract times stated in the Agreement and NTP are noted
as 90 days to SC and 120 to FC; can you please confirm
and provide the correct contract times as this seems likely
a carry-over from another project’s specs?
1. The Contract times are modified as indicated in the
Changes to Specification Section.
AD1-2
Can you please confirm that all taxes, including the City
use tax are to be excluded from pricing?
1. Yes, the City use tax are to be excluded from pricing
for this project.
AD1-3
Can you please confirm the project warranty period is 2
years?
1. Yes, the project warranty period is 2 years
(minimum) unless otherwise stated in a specific
Specification Section.
AD1-4
Can you please confirm what permits are anticipated to be
acquired and paid for by the GC?
1. Morgan County Road Use Agreement
2. Morgan County Building Permit
3. State of Colorado Electrical Permit
4. CDPHE Dewatering and Stormwater Permits
5. Any other permits needed to complete the work as
typically obtained by the Contractor
6. Engineer has worked through Morgan County
Special User Permit; Morgan County Floodplain
development Permit; CDPHE Approval for
Treatment and Site Application; Environmental
Assessment with CDPHE, CPW, and other
stakeholders;
City of Fort Morgan
WWTF Expansion Project
1 of 3
Addendum No. 01
AD1-5
AD1-6
AD1-7
Is the GC responsible for supplying and paying for the
RPR’s field oBice or just for “maintaining”?
1. The City will allow for the use of its oBice space at
the treatment facility for the RPR. This will be
relaxed as a requirement as stated below in
Specifications.
Can you please confirm who is responsible for paying for
materials testing?
1. Yes, the City will retain a materials testing firm for
the work and will pay for the service. The Contractor
will need to coordinate with the specific tester
retained by the City.
Can you please indicate the Engineers Estimate for the
project:
1. The Engineer’s Estimate of Probable Construction
Cost is $43.6M; however, this was developed when
the project was maintaining BABAA requirements.
The project is no longer subject to BABAA
requirements.
Changes to Specifications
Addendum Section – Name,
Number
Article, Page
AD1-8
Section 00 52 00
Addendum Item
Article 4, Part 4.02 A
Replace: The Work will be substantially complete within 90
calendar days after the date of issuances by the Owner
of a Notice to Proceed and completed and ready for
final payment in accordance with Paragraph 15.06 of
the General Conditions within 120 calendar days after
the issuance by the Owner of a Notice to Proceed.
With: The Work will be substantially complete within 700
calendar days after the date of issuances by the
Owner of a Notice to Proceed and completed and
ready for final payment in accordance with Paragraph
15.06 of the General Conditions within 730 calendar
days after the issuance by the Owner of a Notice to
Proceed.
AD1-9
Section 43 11 12 –
Part 2.02.A
Gearless Turbo Blowers Add: B. Inovair, (Kansas City KS)
AD1-10
Section 40 61 13 –
Process Controls and
Instrumentation General
Requirements
Part 1.07 A
Add: 3. AMWes Control, Inc.
4. Browns Hill Engineering and Controls
City of Fort Morgan
WWTF Expansion Project
2 of 3