LOWER CEDAR VALLEY ROAD INDUSTIRAL PARK PROJECT

Location: North Carolina
Posted: Jun 11, 2026
Due: Jul 6, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 410-26-0706
Publication URL: To access bid details, please log in.
Solicitation Number: 410-26-0706
Project Title: LOWER CEDAR VALLEY ROAD INDUSTIRAL PARK PROJECT
Description: Caldwell County is seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Lower Cedar Valley Road Industrial Park Project. The project site is located on Lower Cedar Valley Road near US-321 in the Town of Sawmills, NC.
Opening Date: 7/6/2026 2:00 PM
Posted Date: 6/12/2026
Status: Open
Department: COUNTY OF CALDWELL
Solicitation Number
*
410-26-0706
Department
COUNTY OF CALDWELL
Status Reason
Open
Opening Date
2026-07-06T14:00:00.0000000
Posted Date
*
2026-06-11T17:10:32.0000000Z
Primary Commodity Code
Design Services
Mandatory Conference/Site Visit
Special Instructions
Solicitation Type
*
Select RFP IFB RFI
Owner
Heather Cox
Description
Caldwell County is seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Lower Cedar Valley Road Industrial Park Project. The project site is located on Lower Cedar Valley Road near US-321 in the Town of Sawmills, NC.

Attachment Preview

Caldwell County

RFQ 26-0706

Request for Qualifications for Engineering Services

Preliminary Engineering Report

Design and Construction Services

Project: Lower Cedar Valley Road Industrial Park Project

Caldwell County is seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Lower Cedar Valley Road Industrial Park Project. The project site is located on Lower Cedar Valley Road near US-321 in the Town of Sawmills, NC.

1. Preliminary Engineering Report (PER)

Caldwell County requires a PER to evaluate options for early site work to include demolition and removal of an existing structure, clearing and grubbing, erosion control measures, installation of stream crossing infrastructure, mass grading, and connection to an existing water tap.

Key Components of the PER:

Project Description: A detailed account of all project elements.

Drawings and Layouts: General layouts showing existing site conditions and proposed project components, including rough dimensions and quantities.

Feasibility Analysis: Assessment of project constructability, including design and construction constraints.

Permits and Approvals: A list of required permits and a timeline for obtaining them.

Environmental Considerations: Address potential environmental impacts, including necessary assessments (e.g., biological assessments for endangered species).

Construction Cost Estimate: A detailed estimate covering quantities, unit costs, and total costs, with a defined basis for construction contingencies.

Schedule: Estimated construction schedule.

2. Design and Construction Services

Caldwell County plans to apply for Appalachian Regional Commission (ARC) funding based on the completed PER. If funding is secured, the County anticipates contracting the firm that supplied the PER for the subsequent design and construction phase. If awarded, the ARC Construction project would be managed by NC Department of Commerce's Community Development Block Grant (CDBG) program as Basic Agency and must abide by all relevant state and federal guidelines including but not limited to Davis-Bacon and Related Acts (DBRA), the Build America Buy America Act (BABA), Section 3, and the National Environmental Policy Act (NEPA).

This follow-on contract will encompass scheduling, cost estimation, infrastructure design, permitting, specification, bid document preparation, oversight of the bidding process, project administration/inspection, and final certification.

Caldwell County is the official selection entity and the selected firm will be employed by the County.

3. Submission Details and Requirements

Contact for Specific Questions:

Ashley Bolick, Economic Development Director

Telephone: (828) 728-0768

Email: abolick@caldwellcountync.org

Statement of Qualifications (SOQ)

Caldwell County seeks a competent/qualified firm registered to practice in North Carolina with experience in the following areas:

Specialized Expertise: Appropriate expertise for this type of project.

Team Capacity: Adequate staff, proposed team, and project manager, including location, past performance on similar work, and current workload.

Recent Experience: Track record with project costs and schedules.

Familiarity: Proximity to and familiarity with the project area.

Success Record: History of successfully completed projects without major legal or technical issues.

ARC Experience: Demonstrated successful experience with ARC and CDBG funded projects.

Insurance: Appropriate insurance coverage for the scope of work.

Other Factors: Any other factors deemed appropriate for the project.

Evaluation Criteria

A County staff review committee will rank proposals based on the following criteria:

Labor Rates/Costs

The submittal should include labor rates by category (including overhead and profit), travel costs, and a list of reimbursables not covered by overhead.

Deadlines and Submission

Publish Date: June 13, 2026

Closing Date: July 6, 2026, at 2:00 PM (Proposals received after this time will not be considered.)

Submittal Format: TWO (2) hard copies of the proposal (no more than 30 pages double-sided) and ONE (1) electronic copy on a flash drive.

Submit To (Ashley Bolick, Economic Development Director):

Caldwell County is an Equal Opportunity Employer and promotes Fair Housing practices, encouraging small, minority, and female-owned businesses to submit qualifications.

Block Ad Publication Requirements

The selection process also requires running a block ad:

Run one time in a local newspaper (Affidavit Required).

Run one time in The Charlotte Post (Best Black News Publication in North Carolina).

Post on the NC electronic Vendor Portal (evP).

Must include Fair Housing and EEO Logos.

Criteria Relative Importance
Experience (Project Team, Funding Program, etc.) 30
Work Performance (past record) 30
Capacity to Perform (Available Staff, Location, Schedule, etc.) 30
Other Factors which may be deemed appropriate 10
Mailing Address Physical/Delivery Address
Address: PO Box 2200, Lenoir, NC 28645 1909 Hickory Blvd SE, Lenoir NC 28645
Phone/TDD: (828) 728-0768-4280 / TDD # 1-800-735-2962
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Multiple Building Fire Exhaust Systems Repairs Active Contract Opportunity Notice ID N4008526R9059

DEPT OF DEFENSE

Bid Due: 8/05/2026

Follow 43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 8/05/2026

Follow Multiple Base-wide Location Fencing Repairs Active Contract Opportunity Notice ID N4008524R9072 Related

DEPT OF DEFENSE

Bid Due: 8/20/2026

Project: Federal Pipe Video Contracts Ref. #: 269- 2026-235 Department: City Procurement Type:

City of Charlotte

Bid Due: 8/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.