| Location: | Oklahoma |
|---|---|
| Posted: | Oct 21, 2024 |
| Due: | Oct 24, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA813224Q0054 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
DUE DATE EXTENDED to 24 October 2024
SITE VISIT QUESTIONS & ANSWERS:
1. Are contract employees required to have an on-call spill response capability in the event of a spill outside of 1500-2300 (Swing Shift) working hours?
2. Is there any requirement for a contractor provided vehicle to transport equipment between Building 3001 and Building 3221?
3. Does the government provide a location to store Contractor Personal Protective Equipment on site or will Contractor be required to bring PPE on site and remove daily?
4. The PWS references Contractor-provided brooms, dustpans, mops, etc will be stored in a locked cabinet. Is there a dedicated cabinet located on site to store this equipment?
5. The PWS, 1.3.3, mentions non-reflective black or gray peel coat paint. Is Clear or Translucent acceptable?
6. What is the approximate weight and size of the 76 PMXG’s HEPA vacuums which 1.2.7 references are the responsibility of the Contractor to empty periodically?
7. PWS 1.3.1 (Floor Cleaning). When floor is mopped/power scrubbed during the quarterly cleaning, are there any special requirements for disposing of the contaminated/dirty water? Is it drummed or can it be disposed of down the drain to the IWTP? Does it require approval IAW 1.17 during each quarterly cleaning?
Due date extended to 22 October 2024 to allow for questions and answers which will be posted as an Amendment 2.
Amendment 1 to the CSS adds SITE VISIT information and EXTENDS quote due dates
Cleaning Services for Plasma Spray Booths, Plasma Spray Booth Dust Collectors, and Grit Blast Dust Collectors In Accordance With (IAW) the Performance Work Statement (PWS).
| Oct 15, 2024 | [Combined Synopsis/Solicitation (Updated)] Plasma Spray Booth Cleaning Services |

With GovernmentContracts, you can: