Description of Work:
Provide all labor, materials, methods, processes, implements, tools, machinery, equipment, transportation, permits, services, and all other related functions to complete the Work. Work includes the rehabilitation of the existing airport apron under the FAA Airport Improvement Program (AIP), including mobilization, implementation of a Contractor Quality Control Program (CQCP), and temporary air and water pollution, erosion, and siltation control measures. Work includes removal of existing pavement, excavation and subgrade preparation, and lime-treated subgrade as required, and construction of aggregate base course and asphalt mix pavement. Pavement improvements include application of emulsified asphalt prime and seal coats, joint sealants, and miscellaneous concrete work. The project also includes installation of runway/taxiway/apron markings and aircraft tiedowns.
The County will receive sealed bids for improvements to the Lampson Field Airport:
Schedule I – East Apron Rehabilitation
Schedule II – East Apron Rehabilitation
Bids must be on a unit price basis.
DBE Contract Goal: 0% percent.
License Required: Class A
Estimated Cost of Construction: $950,000.00
Contract Time: 60 calendar days
Liquidated Damages: $3,300 per day
For the federal training program, the number of trainees or apprentices is 1.
The project bid documents are available at www.questcdn.com. This construction contract is Quest CDN project number eBidDoc # 10108771. A contractor may view the contract documents at no cost prior to deciding to become a plan holder. To be considered a plan holder for bidding purposes, a contractor must register with QuestCDN.com and purchase the contract documents in digital form at a cost of $22. Registering as a plan holder is recommended for all prime contractors and subcontractors as plan holders will receive automatic notice of addenda and other contract document updates via Quest CDN. Contact Quest CDN Customer Support at 952-233-1632 or
For security reasons, you must enable JavaScript to view this E-mail address. for assistance in membership registration, downloading digital project information and vBid online bid submittal questions.
For this project, bids will only be received and accepted via the online electronic bid service through QuestCDN.com. To access the electronic bid form, download the project documents and click on the online bid button at the top of the bid advertisement page. Prospective bidders must be on the plan holder list through Quest CDN for bids to be accepted.
Project Bid Documents may be viewed and downloaded at most clearing houses across California; however, you must join Quest CDN and be on the plan holder’s list to be eligible to bid.
A non-mandatory Pre-Bid meeting is scheduled for April 21, 2026 at 1:30 p.m. (PDT). The meeting will be held at Lampson Airfield located at 600 Skypark Drive, Lakeport, CA 95453.
A list of questions asked at this pre-bid, and corresponding responses will be sent to all bidders
in the form of an addendum.
The County will receive on-line bids until 3:00 p.m. (PDT) on the bid open date at QuestCDN.com. Bids received after this time will not be accepted.
Bidders' inquiries should be submitted by email to Scott Hornung at
For security reasons, you must enable JavaScript to view this E-mail address.
.
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be submitted in writing at least five (5) days before bid closing. After this time, the County will not consider these questions as bid protests.
Submit your bid with bidder’s security equal to at least 10 percent of the bid.
You must take necessary and reasonable steps to ensure that DBEs have an opportunity to participate in the Contract (49 CFR 26).
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR Web site, http://www.dir.ca.gov/DLSR/PWD, or from the County’s Department of Public Works.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are included in supplemental documents online at the QuestCDN.com website and are available at
http://www.wdol.gov/dba.aspx
.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, you and your subcontractors must not pay less than the higher wage rate. The County does not accept lower State wage rates not specifically included in the federal wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by you and your subcontractors, you and your subcontractors must pay not less than the Federal minimum wage rate that most closely approximates the duties of the employees in question.
Successful bidders will attend a pre-construction conference held at the office of the Department of Public Works for the purpose of discussing the scope of work, Contract drawings, specifications, existing conditions, material to be ordered, equipment to be used, and all essential matters pertaining to the prosecution and the satisfactory completion of the project. You MUST include all major superintendents for the work and major sub-contractors at this conference. You must appoint a superintendent to act as the single point of contact for the duration of the project. In the event a substitution should be made during the project, you will provide this information in writing.
The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT’s effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.
California Department of Transportation has made available Notices if Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to http://www.dot.ca.gov/hq/esd/oe/contractor_info. Additional information is provided in the Excluded Parties List System at
http://www.epls.gov
.