| Location: | Iowa |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 6, 2026 |
| Agency: | City of Ottumwa |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
NOTICE OF PROJECT
Oxbow Lagoon Trail (Behind Church St.) Project
Ottumwa, IA
Project Description
The Oxbow Lake Trail Project is a resurfacing project for 1150’ of asphalt trail behind Church Street. 650’ of trail will be completely reconstructed. The remaining 500’ is in better condition and the top two inches will be resurfaced.
10% Bid Deposit
100% Performance and Payment Bond
Bid Deadline
May 6, 2026 at 2:00 pm (Central Time)
City Clerk's Office, 1st Floor
City Hall
Bids will be publicly opened and read immediately after the 2:00 pm deadline in Room 108 by the City Clerk's office.
Project Start Date: After issuance of Notice to Proceed
Project Completion: July 1, 2026
Liquidated Damages: $200.00 per day.
Engineer's Opinion of Cost: $70,000.00
Project Contact: Phillip Burgmeier, PE
City Engineer
(641) 683-0680
Project Documents

With GovernmentContracts, you can:
...for the Harrison Street Resurfacing Project.This project includes asphalt pavement resurfacing... and replacement, ...
City of Davenport
Bid Due: 6/23/2026
...Cement Concrete (PCC); composite pavement consisting of PCC and Hot Mix Asphalt (HMA); ...
City of Iowa
Bid Due: 6/09/2026