| Location: | Florida |
|---|---|
| Posted: | May 24, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | City of Lakeland |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Construction Manager at Risk Services (CMAR) for the McIntosh Power Plant Unit 5 Administration Building Addition
Addenda: 0
Release Date: 5/22/2026
Due Date: 6/23/2026
Lakeland Electric, a division of the City of Lakeland, is requesting sealed statements of interest and qualifications from licensed state certified and qualified general contractor Construction Manager at Risk (CMAR) firms to furnish all work, necessary permits, and construction supervision for the construction of the McIntosh Power Plant Unit 5 Administration Building Addition, per terms, conditions, and specifications contained herein. Upon the completion of the review process, Lakeland Electric intends to enter into direct negotiations with the most qualified respondent, resulting in a single contract award.
Lakeland Electric, a division of the City of Lakend, is requesting sealed statements of interest and qualifications from licensed and qualified contractors to provide construction management services with Guaranteed Maximum Price for the construction of the McIntosh Power Plant Unit 5 Administration Building Addition. The project involves the construction of a two-story administrative office building addition and modification to existing building for second floor egress, including all necessary site work and building construction of the facility. The selected company will manage all aspects of the construction process, ensure quality workmanship, adhere to safety regulations, and deliver the project on time and within budget.
The project will be at McIntosh Power plant, adjacent to the existing Unit 5 Administration Building, located at 3400 East Lake Parker Drive, Lakeland, Florida.
The proposed two-story addition will be constructed on the south side of the existing Unit 5 Administration Building and will provide approximately 11,100 square feet of new office, conference, and support space across two floors. The first floor will serve existing staff with 19 private offices, a large conference room, collaboration space, chemistry laboratory, kitchen, mechanical / electrical room, and restrooms. The second floor will accommodate future growth with additional offices, conference room, break room, backup control room, mechanical / electrical room, and restrooms. The floors will be connected by an interior stairwell, and the second floor will connect to the existing building via an elevated breezeway which will require some modification to the existing building as required to make this connection.
Minimum Project Requirements:

With GovernmentContracts, you can:
Project ID: Title: Vault Room and Oil Room Project Addenda: 0 Release Date:
Sarasota County
Bid Due: 8/26/2026
Project ID: Title: Red-Light Camera Traffic Infraction Detector System Addenda: 0 Release Date:
City of Orlando
Bid Due: 9/17/2026
Main Agency Hillsborough County Public Schools Status Active Fiscal Year 2026 Primary Contact
Hillsborough County Public Schools
Bid Due: 8/17/2026
Follow Environmental Analytical and Regulatory Compliance Services Active Contract Opportunity Notice ID FA6648-19
DEPT OF DEFENSE
Bid Due: 8/07/2026