Calmar 52nd Street and 52nd Ave Surface Rehab

Location: Alberta
Posted: Apr 5, 2026
Due: Apr 17, 2026
Agency: Government of Alberta
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: AB-2026-02766
Publication URL: To access bid details, please log in.
Open & Competitive Opportunity • Invitation to Bid
Amended Open
Town of Calmar
a)        52nd Avenue:
.1        Conduct a pre‑overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation.
.2        Contractor to complete asphalt repairs, including pothole repairs consisting of full‑depth removal and replacement with granular material having a maximum particle size of 50–75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri‑axial geogrid material and a non‑woven geotextile separator.
.3        Remove and replace existing monolithic concrete sidewalk and rolled face curb and gutter on the north side of the avenue as shown on drawings.
.4        Remove and replace existing rolled face concrete curb and gutter on the south side of the avenue as shown on drawings.
.5        Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
.6        From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie‑in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness.
.7        Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt.
.8        Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations.
.9        Landscape restoration adjacent to concrete works.
.10        Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
b)        52nd Street:
.1        Conduct a pre‑overlay inspection with ISL and the Town of Calmar representative to identify locations requiring asphalt repairs, including potholes and crack rehabilitation.
.2        Contractor to complete asphalt repairs, including pothole repairs consisting of full‑depth removal and replacement with granular material having a maximum particle size of 50–75 mm, placed to match the existing pavement structure. The existing granular pavement structure is expected to be between 300 mm and 450 mm in depth. Granular material shall be compacted and placed on tri‑axial geogrid material and a non‑woven geotextile separator.
.3        Remove and replace monolithic existing concrete walk, rolled face curb & gutter on the east side of the street.
.4        Sawcut and removal of the west existing concrete walk, rolled face curb & gutter and replace with rolled face concrete curb and gutter.
.5        Sawcut and remove a 0.5 m wide strip of asphalt adjacent to the existing lip of gutter to provide working space for curb construction and to create a smooth transition with the proposed asphalt overlay. Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
.6        From the edge of the sawcut described in Clause .5, mill a 0.5 m wide strip at a depth of 50 mm (minimum) into the existing asphalt roadway to provide tie‑in to the existing asphalt and achieve a minimum 50 mm asphalt overlay thickness.
.7        Place asphalt prefill from the lip of gutter to a width of 1.0 m, filling all areas described in Clauses .5 and .6 to match the elevation of the existing asphalt.
.8        Place a minimum 50 mm asphalt overlay throughout the roadway, extending from the constructed lip of gutter on either side of the road, filling all voids, milled areas, and prefill locations.
.9        Landscape restoration adjacent to concrete works.
.10        Provide traffic accommodation to allow traffic flow and resident parking throughout the duration of construction.
APC Reference # AB-2026-02766
Category Construction
Posting Date • Time Apr 2, 2026 • 8:45 pm (MT)
Closing Date • Time Apr 17, 2026 • 2:00:00 pm (MT)
Region(s) of Delivery Alberta, Calmar
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., ALONG WITH MEDICAL GAS Ministry of Infrastructure APC Closing date Extension to ...

Government of Alberta

Bid Due: 1/15/2027

...opportunity uses APC E-submission. Respondents must submit a submission via the APC E-submissions... ...

Government of Alberta

Bid Due: 6/12/2026

...Blatchford Renewable Energy Centres (IPD) See 935707 Sourcing Event Notification attached. APC...

Government of Alberta

Bid Due: 6/11/2026

...house. APC Reference # AB-2026-03839 Category Services Posting Date * Time May 15, ...

Government of Alberta

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.