RFQ No. 26-14 - Design-Connecting Communities Trails Project - Addendum No. 3 - Q&A's

Location: Colorado
Posted: May 22, 2026
Due: May 28, 2026
Agency: Pueblo County
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFQ No. 26-14
Publication URL: To access bid details, please log in.
  • RFQ No. 26-14 - Design-Connecting Communities Trails Project - Addendum No. 3 - Q&A's 432.06 KB
  • Attachment Preview

    PUEBLO COUNTY PURCHASING
    215 WEST 10TH STREET, ROOM 14
    PUEBLO, CO 81003
    Telephone: (719) 583-6097
    purchasing@pueblocounty.us
    ADDENDUM NO. 3
    COUNTY OF PUEBLO, COLORADO
    RFQ No 26-14 - Design-Connecting Communities Trails Project
    Date: May 22, 2025
    What thse Change is being done to the current RFQ:
    1. Questions & Responses
    The proposer shall permanently affix this Addendum No. 3 to the RFQ packet so it will be
    submitted with the RFQ.
    The undersigned proposer acknowledges receipt of this Addendum No. 3.
    Received by: _________________________________________
    Firm Name: ___________________________________________
    Address: _____________________________________________
    Date: ________________________________________________
    Page 1 of 1
    1. Does the County anticipate the need for any easements, or right-of-way? The RFP
    references right-of-way plans, but it appears that the corridor allows adequate
    space for the trail without obtaining easements. To what extent are the right-of-way
    plans needed?
    Response: Yes, ROW plans will be required to develop an easement for County
    maintenance of the trail.
    2. Does the County anticipate any environmental analysis or research needed along
    the corridor?
    Response: Yes.
    3. Can the County confirm what is required for the submittal? Section 4.1 indicates
    that email of the proposal is a separate option from hardcopy, but in Section 4.3, five
    hardcopy and a pdf on a cd/usb is required.
    Response: Please submit RFQ’s via hardcopy PDF or USB.
    4. Is geotechnical engineering required for this project? Have geotechnical
    investigations been conducted along Medal of Honor Blvd that can be used for the
    multi-use trail portion of the project? Is there any geotechnical information from
    past projects along the west side of Pueblo Blvd. that can be used?
    Response: Yes, geotechnical engineering will be required for the SH-45 portion of
    the trail. Geotechnical reports were completed for the Medal of Honor Project and
    will be uploaded via Addendum #2. The County does not possess any geotechnical
    information for past projects in CDOT ROW.
    5. Can the County provide the figures from the planning document that show the
    proposed trailhead and mobility hub locations as indicated in Section 2.1, 2nd
    paragraph?
    Response: The figure will be posted under Addendum #2.
    6. The RFQ for the connecting communities project references a dropbox containing
    relevant information. Would you be able to share that with me? The RFQ mentions a
    planning document with Figures outlining the adjacent transit stops. Is this available
    to share?
    Response: Response: The figure will be posted under Addendum #2.
    7. Section 4.0 SOQ Submittal Requirements - Section 4.1 (page 11) Due Date, Time
    and Location indicate a “Via email: purchasing@pueblocounty.us” option for
    delivery of the SOQ. Is this in lieu of the Four (4) bound copies and one CD or USB
    drive from Section 4.3 (page 12) Submittal Quantities? Please Clarify.
    Please submit RFQ’s via hardcopy PDF or USB.
    8. Section 4.2 (page 12) Format indicates 30 single-sided pages and one page for a
    Project Timeline-Gantt Chart. Can the Gantt Chart be an 11x17 page size. And is the
    Gantt Chart part of the 30 single-sided page limit? Also, can an additional 11 x 17
    page be used as part of the 30 single-sided page limit? Please clarify.
    Response: Yes, an 11 x 17-page size can be used for the Gantt Chart and the 30
    single-sided pages. The Gantt Chart is not included in the page limit.
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...RFQ: Architectural & Engineering Design Services for Vibrant Denver Closing date June 18, ...

    City of Denver

    Bid Due: 6/18/2026

    ...Description: PMAA, 5503, Bruch SC Design, C24NE6, PROSVC Department: DNR - Division of ...

    State Government of Colorado

    Bid Due: 6/30/2026

    ....) for: DESIGN, FABRICATION, AND INSTALLATION OF DISTRICT MARKERS FOR WESTLAND AREA MEDIANS ...

    City of Lakewood

    Bid Due: 6/17/2026

    ...Bid Number: 26-008 Bid Title: MPW Fitness Equipment Category: Construction and Design Services... ...

    City of Montrose

    Bid Due: 6/18/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.