What thse Change is being done to the current RFQ:
1. Questions & Responses
The proposer shall permanently affix this Addendum No. 3 to the RFQ packet so it will be
submitted with the RFQ.
The undersigned proposer acknowledges receipt of this Addendum No. 3.
Received by: _________________________________________
Firm Name: ___________________________________________
Address: _____________________________________________
Date: ________________________________________________
Page 1 of 1
1. Does the County anticipate the need for any easements, or right-of-way? The RFP
references right-of-way plans, but it appears that the corridor allows adequate
space for the trail without obtaining easements. To what extent are the right-of-way
plans needed?
Response: Yes, ROW plans will be required to develop an easement for County
maintenance of the trail.
2. Does the County anticipate any environmental analysis or research needed along
the corridor?
Response: Yes.
3. Can the County confirm what is required for the submittal? Section 4.1 indicates
that email of the proposal is a separate option from hardcopy, but in Section 4.3, five
hardcopy and a pdf on a cd/usb is required.
Response: Please submit RFQ’s via hardcopy PDF or USB.
4. Is geotechnical engineering required for this project? Have geotechnical
investigations been conducted along Medal of Honor Blvd that can be used for the
multi-use trail portion of the project? Is there any geotechnical information from
past projects along the west side of Pueblo Blvd. that can be used?
Response: Yes, geotechnical engineering will be required for the SH-45 portion of
the trail. Geotechnical reports were completed for the Medal of Honor Project and
will be uploaded via Addendum #2. The County does not possess any geotechnical
information for past projects in CDOT ROW.
5. Can the County provide the figures from the planning document that show the
proposed trailhead and mobility hub locations as indicated in Section 2.1, 2nd
paragraph?
Response: The figure will be posted under Addendum #2.
6. The RFQ for the connecting communities project references a dropbox containing
relevant information. Would you be able to share that with me? The RFQ mentions a
planning document with Figures outlining the adjacent transit stops. Is this available
to share?
Response: Response: The figure will be posted under Addendum #2.
7. Section 4.0 SOQ Submittal Requirements - Section 4.1 (page 11) Due Date, Time
and Location indicate a “Via email: purchasing@pueblocounty.us” option for
delivery of the SOQ. Is this in lieu of the Four (4) bound copies and one CD or USB
drive from Section 4.3 (page 12) Submittal Quantities? Please Clarify.
Please submit RFQ’s via hardcopy PDF or USB.
8. Section 4.2 (page 12) Format indicates 30 single-sided pages and one page for a
Project Timeline-Gantt Chart. Can the Gantt Chart be an 11x17 page size. And is the
Gantt Chart part of the 30 single-sided page limit? Also, can an additional 11 x 17
page be used as part of the 30 single-sided page limit? Please clarify.
Response: Yes, an 11 x 17-page size can be used for the Gantt Chart and the 30
single-sided pages. The Gantt Chart is not included in the page limit.