| Location: | District of Columbia |
|---|---|
| Posted: | May 22, 2026 |
| Due: | May 29, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
IFB-26-22432 Alterations & Renovations of Operations Center, DCA
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision to renovate the Operations Center located in Terminal 1 at Ronald Reagan Washington National Airport (DCA).
Solicitation Issue Date: April 28, 2026
Due Date for Submissions: May 29, 2026
Amendments Issued: None
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision to renovate...
Metropolitan Washington Airports Authority
Bid Due: 6/03/2026
...Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision to renovate...
Metropolitan Washington Airports Authority
Bid Due: 6/03/2026
...Building Construction Place of Performance: DC USA Description Renovate Fire Place at the ...
TREASURY, DEPARTMENT OF THE
Bid Due: 6/29/2026