| Location: | Utah |
|---|---|
| Posted: | Oct 22, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2027WellDev |
| Publication URL: | To access bid details, please log in. |
Project Description: Dual Swab Development and Test Pumping of a production well (Well #1R) using a Cable Tool Rig. The well will be swabbed and pumped simultaneously to maximize the efficiency of the well while recording parameters such as static water level, pumping water level, flow rate while pumping, and sand production. The anticipated construction of the well is a 20-inch diameter casing, with approximately 300 feet of screen, to an anticipated depth of 800 feet. Figure 1 shows the location and site plan of the well.

With GovernmentContracts, you can:
...Project: New South Elementary Construction Ref. #: DF-1026CMGC-112 Department: SCHOOL DISTRICTS... purpose of ...
State Government of Utah
Bid Due: 11/16/2026
...Project: Construction: Taylorsville High School Addition Ref. #: DB27-011-RFP Department: SCHOOL... of this ...
State Government of Utah
Bid Due: 11/19/2026
...Public Works Facility Construction Project - Phase 2 Big-D Construction has been selected... ...
City of Logan
Bid Due: 11/12/2026
...Project: Construction: Irrigation System at West Kearns Elementary Ref. #: JF27-015-IFB Department...
State Government of Utah
Bid Due: 11/12/2026