| Location: | Utah |
|---|---|
| Posted: | Oct 22, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2027WellDev |
| Publication URL: | To access bid details, please log in. |
Project Description: Dual Swab Development and Test Pumping of a production well (Well #1R) using a Cable Tool Rig. The well will be swabbed and pumped simultaneously to maximize the efficiency of the well while recording parameters such as static water level, pumping water level, flow rate while pumping, and sand production. The anticipated construction of the well is a 20-inch diameter casing, with approximately 300 feet of screen, to an anticipated depth of 800 feet. Figure 1 shows the location and site plan of the well.

With GovernmentContracts, you can:
...Project: 2026 - 2027 Saratoga Springs Irrigation Well 9 RFB Ref. #: 2026-016 ...
State Government of Utah
Bid Due: 11/19/2026
...Project: South Salt Lake Price Avenue Well Development Project Ref. #: PN 2026-22 ...
State Government of Utah
Bid Due: 11/17/2026
...Request for Proposals - Geophysical Survey and Subsurface Mapping - Municipal Groundwater Well... ...
Town of Apple Valley
Bid Due: 11/09/2026
...to be remodeled to provide more toilet room fixtures as well as an ...
Utah State University
Bid Due: 11/12/2026