| Location: | Utah |
|---|---|
| Posted: | Oct 22, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2027WellDrilling |
| Publication URL: | To access bid details, please log in. |
Project Description: Drilling of an exploratory pilot hole followed by reaming for construction of a production well using the reverse-rotary drilling method. The well is to be used in the Orem City drinking water system. Well #1R is anticipated to be completed with a 20-inch diameter casing to a total depth of approximately 800 feet. Anticipated production is from multiple Pleistocene alluvium aquifers.

With GovernmentContracts, you can:
...Project: 2026 - 2027 Saratoga Springs Irrigation Well 9 RFB Ref. #: 2026-016 ...
State Government of Utah
Bid Due: 11/19/2026
...Project: South Salt Lake Price Avenue Well Development Project Ref. #: PN 2026-22 ...
State Government of Utah
Bid Due: 11/17/2026
...Request for Proposals - Geophysical Survey and Subsurface Mapping - Municipal Groundwater Well... ...
Town of Apple Valley
Bid Due: 11/09/2026
...to be remodeled to provide more toilet room fixtures as well as an ...
Utah State University
Bid Due: 11/12/2026