| Location: | Georgia |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Jul 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA483026Q0057 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This Sources Sought (SS) is issued solely for market research purposes to determine potential sources. This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), or Invitation for Bid (IFB) and is not to be construed as a commitment by the Government to issue an order otherwise pay for the information solicited, nor is it a guarantee of a forthcoming solicitation or contract. No reimbursement will be made for any costs associated with providing information in response to this announcement. It is the responsibility of potential quoters to monitor SAM.gov for additional information pertaining to this requirement.
Description of the product or service and delivery schedule:
The requirement is for the procurement of commercial off-the-shelf (COTS), NDAA-compliant 7-inch First Person View (FPV) quadcopter drones, unassembled drone kits, and FPV pilot kits (including goggles and controllers).
List of items to meet the mission:
100 EA - 7-inch First Person View (FPV) Quadcopters Drones
16 EA - 7-inch FPV Quadcopter Unassembled Drone Kits
17 EA - FPV Pilot Kits
1 EA - 3 Day User Training
- Min weight 1lb - Max weight 2lb
- Solder Free Components
- Payload Capacity: Min - 5lb | Max 6lb
- FY24 NDAA Compliance on all active components
- Speed: Min 100mph | Max 120mph
To meet mission parameters, the systems must possess the following salient characteristics and critical performance requirements:
Physical/Operational: Must be a 7-inch quadcopter form factor equipped with an FPV camera.
Maintenance: Must feature a 100% solder-free design for assembly and component replacement to allow for rapid field maintenance.
Architecture: Must feature an open architecture with absolutely no proprietary software or hardware restrictions.
Compliance (Critical Risk Factor): The commercial drone market is heavily saturated with restricted foreign-manufactured electronics. To mitigate this risk, the entire system—specifically the Flight Controller, Long Range System (LRS), Video Transmitter (VTX), Camera, and Pilot Goggles—must be strictly compliant with National Defense Authorization Act (NDAA) Section 848/889 supply chain restrictions.
RESPONSES MUST PROVIDE THE FOLLOWING:
All responses shall be received by Monday, 20 July 2026 at 4:00 PM Eastern Time.
Send responses via e-mail to SSgt Justin De Jesus, justin.de_jesus@us.af.mil by the response date.
Any questions regarding this Sources Sought can be directed to myself at justin.de_jesus@us.af.mil or at (229) 257-2084.
Attachments:

With GovernmentContracts, you can:
...the existing walls along with hard ceilings. Minor domestic piping, door hardware, and ...
Cobb County School District
Bid Due: 8/18/2026
...elevation refacing/replacement. Sprinkler system expansion. Various door/hardware and window replacements...
Cobb County School District
Bid Due: 8/12/2026
...walls along with hard ceilings. Minor domestic piping, door hardware, and wall patching ...
State Government of Georgia
Bid Due: 8/18/2026
...and hardware will be replaced by the contractor. This will also include a ...
Hall County
Bid Due: