RFQ-P Well No. 4 and WTP Phase II and III Engineering Services

Location: Illinois
Posted: Oct 20, 2026
Due: Nov 6, 2026
Agency: Cary village
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Solicitation No: 10/20/2026
Publication URL: To access bid details, please log in.
Bid Number: 10/20/2026
Bid Title: RFQ-P Well No. 4 and WTP Phase II and III Engineering Services
Category: Public Works
Status: Open
Description:

The Village of Cary Department of Public Works is seeking Design and Construction Engineering Services for its Well #4 and Water Treatment Plant Water System Resiliency and PFAS Mitigation Project, located at 106 Ann Street, Cary, IL 60013. The project is partially funded by the USEPA Community Grants Program.

Publication Date/Time:
10/20/2026 12:00 PM
Closing Date/Time:
11/6/2026 11:00 AM
Submittal Information:
Submittals are due no later than November 6, 2026 at 11:00 AM
Bid Opening Information:
NA
Contact Person:
Caty Ward, Capital Projects Manager
cward@caryillinois.com
Related Documents:

Attachment Preview

October 20, 2026
Request for Qualifications and Proposals for Well #4 and Water Treatment Plant Water System
Resiliency and PFAS Mitigation Project, Phase II and Phase III, Design and Construction
Engineering Services
The Village of Cary Department of Public Works (hereafter Village) is seeking Design and
Construction Engineering Services for its Well #4 and Water Treatment Plant Water System
Resiliency and PFAS Mitigation Project, located at 106 Ann Street, Cary, IL 60013. The project is
partially funded by the USEPA Community Grants Program.
The selected consultant shall perform and carry out, in a professional and satisfactory manner, the
necessary services required to complete the project. The Village shall provide a Capital Projects
Manager to assist the Consultant in Village interpretations. The services to be provided related to
this Request for Qualifications and Proposal (RFQ-P) are described in the Minimum Scope of Services
section of this RFQ-P. All work must adhere to local, state, and federal codes and standards as
required.
The consultant shall have successfully completed a minimum of three projects of similar type and
size as these improvements. The proposed Project Manager(s) shall have a minimum of five years of
experience in Construction management and inspection.
The consultant shall be responsible for completing all facets of the project’s design and construction
oversight. The consultant shall provide design services, design drawings, plan specifications, and
cost estimates. Cost estimates shall be provided at 30%, 60%, 90, and 100% design milestones.
Project Description
The project generally consists of replacing equipment approaching the end of its useful life at the
existing Well #4 and Water Treatment Plant (WTP), including the fence, submersible well pump and
motor, aerator/ion exchange system, booster pumps and control valves, automatic vacuum priming
system, process piping, and valving.
Most of the equipment at the Well #4 WTP site was installed in 1997 and is therefore almost 30 years
old. The existing submersible pump and motor for deep Well #4 is at the end of its useful life and
requires replacement. Additionally, the well casing/well downhole must be inspected. Once the
existing well pumping equipment is removed from the well, additional well rehabilitation and/or
repairs may be identified.
The project scope as proposed in the Community Grants Work Plan is as follows.
1. Remove and replace the existing Well #4 pumping equipment, including a new submersible
well pump, new submersible motor, new epoxy-coated steel column pipe, submersible power
cable, check valves, dual airlines, and other related appurtenances required for complete
installation.
2. Complete well rehabilitation and repairs if identified/recommended by the well contractor
during pumping equipment removal and well downhole inspection.
3. Remove existing 4-foot perimeter fence and install 6-foot security fencing and gates around
the facility that are appropriate for a residential area application.
Page 1 of 6
4. Remove and replace the Well #4 treatment equipment, including the aerator and ion
exchange vessel. The proposed treatment solution must be identified during the design
phase.
5. Remove and reinstall the Well #4 WTP building cupola and surrounding roofing, as needed
for removal and replacement of the existing treatment equipment.
6. Remove and replace the brine making equipment, including piping, valving, fittings, and
flowmeters for brine and make-up water.
7. Remove and replace the raw water, bypass, and finished water flowmeters.
8. Remove and replace the automatic vacuum priming system, including piping, air release
valves, and other relevant appurtenances.
9. Remove and replace the two booster pumps and the 8” pump control valves. Reconfigure the
process piping as needed to allow the new booster pumps to fit within the space.
10. Remove and replace aging process valves and relevant appurtenances.
11. Complete electrical, instrumentation & controls, plumbing, and mechanical improvements to
accommodate the new equipment. This includes SCADA integration.
12. Provide sediment and erosion control and site restoration as needed to remove/replace the
cupola and install the treatment equipment.
The minimum scope of services is being solicited as follows.
Minimum Scope of Design Engineering Services
• Meet with Village staff to develop schematic design, design progress drawings, specifications,
and construction documents.
• Schedule and conduct bi-weekly project progress meetings. Meeting frequency may be
reduced on an as-needed basis.
• Develop detailed project plans and specifications that meet EPA requirements.
• Conduct at least one site visit and assess the project area.
• Prepare 30%, 60%, 90%, and 100% design documents for Village review.
• Comply with all requirements of EPA regulations related to the Villages Community Grants
Program Grant Agreement.
• Prepare, submit, and secure IEPA Public Water Supply Construction Permit, and other
relevant permits, as required by local, state, and federal agencies.
• Submit contract documents to EPA for approval prior to bidding the project.
• The Consultant shall coordinate the project with the Village, County, State, and EPA as needed.
The selected Consultant shall attend with Village staff all appropriate meetings with other
agencies involved to ensure appropriate project coordination.
• Provide a project design schedule with recommended meetings and review dates.
• Complete Agency and Utility Coordination.
• Provide topographic survey of the Well #4 property.
Minimum Scope of Construction Administration Services
• Obtain any necessary permits.
Page 2 of 6
• Schedule and moderate the preconstruction meeting with the Village, Contractor,
subcontractors, and utility companies. Prepare the agenda and meeting minutes.
• Complete Agency and Utility Coordination.
• Provide pre-construction existing condition photos, including private property that may be
impacted by construction operations.
• Assist the Village with the WTP startup process and project closeout.
• Assist the Village with progress reports to the EPA, as needed for the grant.
• Comply with all requirements of EPA regulations related to the Villages EPA Community
Grants Program Grant Agreement.
• Assist in Grant Administration of Community Grant Program award.
• Coordinate construction activities with Village staff and Contractor(s).
• Provide bi-weekly project updates with progress photos during active construction activities.
• Conduct construction observation site visits during active construction activities.
• Provide construction inspection services to verify that the Contractor constructs the
improvements according to the Plans and Specifications.
• Maintain Quality Control/Quality Assurance Plans.
• Review and recommend pay applications.
Deliverables
Design:
• Design drawings and specifications
• Bi-weekly project updates
• Construction drawings and specifications
• Bid phase services
o Bid advertisement
o Pre-bid meeting
o Bid addenda
o Bid opening at the Cary Municipal Center
o Bid proposal review and final recommendation
Construction:
• Construction contract coordination including, but not limited to, construction engineering
activities, oversight, closeout documentation with contractor(s) and USEPA.
• Weekly project updates during active construction.
• Construction pay estimate review and recommendations.
Submittals
• A Statement of Qualifications which shall contain a list of the names and roles of each of the
personnel assigned to the project, including subconsultants (not to exceed two pages).
Page 3 of 6
• Resumes for three (3) key personnel on the project (not to exceed one page each).
• Provide a table of three (3) project references for recent projects completed by the proposed
project team. This table shall include:
o Project Name
o Brief Project Description
o Project Manager
o Local Agency Contact Information
• A statement of project understanding describing the scope of the project and items that may
require special attention or detail (not exceeding two pages).
• Recommendations of design and/or construction administration tasks to include in the
contract scope that is not explicitly stated in the scope of work defined herein.
• A schedule for the project including Construction. The schedule shall include the following
activities/milestones (at a minimum), and any other activities/milestones deemed relevant
to the successful completion of the project:
o Assume November 18, 2026, Notice to Proceed for Design & Construction
Engineering Services
o 30% Design Submittal in March 2027
o 60% Design Submittal in June 2027
o 90% Design Submittal in August 2027
o Construction Bid Posting in January 2028
o Village Board Approval of Construction Contract
Village Board meets on the first and third Tuesday of the month.
o Pre-construction Meeting
o Construction Final Completion in October 2029
• A Not to Exceed (NTE) fee and hour-based proposal with rates shall be provided in a
sealed envelope separate from the QBS submittal. Submittals that do not have a
separately sealed fee and hour-based proposal will be rejected.
Selection Procedure
The Village reserves the right to reject any or all Proposals, to waive any or all technicalities, or to
accept the proposal deemed most advantageous to the Village.
Responses will be reviewed by the Village evaluation team for the purpose of identifying and
recommending the firm offering the highest qualifications and experience with this type of project.
If desired, the Village may interview a short-list of applicants to better evaluate and compare.
Interviews may be waived if determined unnecessary.
Page 4 of 6
The winning selections will be based upon project understanding, technical qualifications and
approach, firm experience, staff capabilities, and municipal experience.
The following table depicts the selection criteria and weighting for each item
Criteria
Project Understanding
Technical Qualifications & Approach
Firm Experience
Staff Capabilities
Municipal Experience
Weighting
20%
30%
20%
20%
10%
Miscellaneous Terms and Conditions
1. The Village reserves the right at any time and for any reason to cancel this RFQ-P or any
portion thereof, to reject any or all submittals, or to accept an alternate proposal. The
Village reserves the right to waive any immaterial defect in any submittal. The Village may
seek clarification on a submittal at any time and failure to respond promptly may be cause
for rejection.
2. The Village will not be liable in any way for any costs incurred by respondents in replying to
this RFQ-P.
3. The Village will not reimburse the selected firm for travel.
4. The proposer is solely responsible for ensuring that any question submitted to the Village,
via email, has been received. If a Village employee does not provide written confirmation
of receipt of question within twenty-four (24) hours after the proposer's email
submission, the proposer shall take appropriate action to verify receipt. The proposer
shall not assume that a question has been received by the Village unless and until a
Village employee provides confirmation of receipt.
5. The Village reserves the right to negotiate with the highest-qualified firm the final
personnel, schedule, and compensation. If an agreement cannot be reached, the Village
reserves the right to terminate negotiations and proceed with the next most qualified
consultant.
6. All drawings, specifications, reports, calculations, CAD files, GIS data, models, and other
documents prepared under this contract shall become the property of the Village upon
payment for services rendered.
Submittal and Proposal Due Date
The Village is requesting one (1) submittal be submitted no later than November 6, 2026, at 11:00
A.M. CST. Submittals will not be accepted digitally. A separate sealed envelope including the fee and
hour-based proposal should be submitted at the same time. Submittals that do not have a
separately sealed fee and hour-based proposal will be rejected.
Submission Locations:
Mailing/Shipping Address:
Village of Cary
Attn: Caty Ward, Capital Projects Manager
755 Georgetown Drive
Cary, IL 60013
Page 5 of 6
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Solicitation # 27-420DCEO-COMMA-B-54665 Bid Solicitation # 27-420DCEO-COMMA-B-54665 Organization Name CEO - Commerce

State Government of Illinois

Bid Due: 1/21/2027

Project: Sale of Surplus Chicago Public Schools Real Estate: 2 Vacant Buildings and

Chicago Public Schools

Bid Due: 12/18/2026

#EWM198 Request for Proposal: Student Recruitment Marketing Strategy Assessment UIC #EWM198: Student Recruitment

Illinois Public Higher Education

Bid Due: 1/08/2027

REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES The City of Lockport is soliciting

Lockport city

Bid Due: 11/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.