| Location: | Georgia |
|---|---|
| Posted: | May 12, 2025 |
| Due: | Jun 10, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66243-NONST-2025-000000068 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66243-NONST-2025-000000068 | Bid 2025-24 East Regional Force Main | Perry, City Of |
May 12, 2025 @ 11:26 AM
|
Jun 10, 2025 @ 11:00 AM
|
Start Date: May 12, 2025 @ 11:26 AM ET
End Date:
Jun 10, 2025 @ 11:00 AM ET
Competitive Cost Sealed Bids
Separate sealed Bids for the construction of East Regional Force Main for the City of Perry (Bid Number 2025-24) will be received until Tuesday, June 10, 2025, at 11:00 a.m. in the City Administration Building, 1211 Washington Street, Perry, GA 31069. Bids will then be publicly opened and read aloud at said office. Any bid received after Tuesday, June 10, 2025, at 11:00 a.m. will not be considered by the Owner. Following the closing time for the receipt of bids, no bid may be withdrawn for a period of sixty (60) days.
1.2 Scope of Work
The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following:
Installation of 8,730 LF of 20¿ force main and 4,440 LF of 18¿ force main, along with associated air release valves, fittings, plug valves, and connections. The project also includes the jack and bore of Hwy 341 with 120 LF 30¿ steel casing and the railroad with 100 LF of 36¿ steel casing. The time allotted for substantial completion of the work is 180 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 210 consecutive calendar days from the Notice to Proceed.
The contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 951-5165.
All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
| Code | Description |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91330 | Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation |
| 96191 | Water and Petroleum Pipeline Services |
| 91479 | Structural and Reinforcement Metal Work (Inactive, please see commodity code 914-57 effective Januar |
| 89081 | Water Main Cleaning Equipment |
GWES LLC
william-jones@gwesllc.com
478-951-5165

With GovernmentContracts, you can:
..., Construction 15538 Field Offices and Sheds, Construction Type 67053 Pipeline Equipment and ...
State Government of Georgia
Bid Due: 6/12/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91340... Construction, Pipeline, Including ...
State Government of Georgia
Bid Due: 7/09/2026
...Pipeline Equipment and Tools, Construction and Laying of the Pipeline 91117 C.I.P., Construction... ...
State Government of Georgia
Bid Due: 6/11/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91378... Agency Event Status: ...
State Government of Georgia
Bid Due: 6/18/2026