The purpose of this solicitation for Arlington East WRF – Reclaimed Water and Distribution Upgrades (this "Solicitation") is to evaluate and select a vendor to provide pre-construction services (including early works activities) and construction of a new wastewater reclamation facility which may include: filter feed pump station; filter feed pump electrical building and emergency generator; four disk filters; high level disinfection UV system; UV electrical building; reclaimed water transfer pumps station; two 3-mg ground storage tanks; reclaimed water distribution pump station; reclaimed water distribution pump station electrical building with emergency generator; effluent pumps and flow meter; non-potable plant water pump station; laboratory building; modification to existing sodium hypochlorite system; demolition of existing filter feed pumps in Splitter Box 3, existing filters, existing low-level disinfection (LLD) UV structure, existing chlorine contact basin structure including reclaimed distribution pumps, existing sodium bisulfite system, existing laboratory trailer / awning, existing pump storage structure; site work; fiber optics; ancillary networks and security; fire alarm system; and compliance with Factory Mutual (FM) global requirements as described in this Solicitation (the "Work") and to determine the best method for JEA to procure the Work with regards to pricing, quality, design, and workmanship.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/924411/
Mandatory Pre-Response Meeting: January 22, 2025, at 1:00 PM
Optional Site Visit: February 05, 2025 at 11:00am
Response Due Date: February 19, 2025
Response Due Date: March 04, 2025

With GovernmentContracts, you can:
...covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization.... ...
DEPT OF DEFENSE
Bid Due: 6/23/2026
..., other data furnished in SOW, and information covered during a pre-construction/criteria review ...
DEPT OF DEFENSE
Bid Due: 6/12/2026