| Location: | New York |
|---|---|
| Posted: | Jul 2, 2025 |
| Due: | Jul 29, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: REPAIR AND BRIDGE CONSTRUCTION FOR POND NO. 3 DAM The repair work includes filling the voids in the existing rubble masonry spillway abutments with urethane grouting and repointing the deteriorated mortar joints. The replacement work of the bridge includes demolition of the existing bridge, demolition of part of the abutments, preparing a concrete surface over the existing abutment, construction of a new precast plank bridge, roadway pavement and addition of new timber guide and bicycle rails. The work will also include the removal of any existing railing system (concrete posts, pipe rails and stones) located within the project area as indicated on the plans. Due Date: 07/29/2025 11:30 AMContract Term: 120 days Location: Wee Wah Rd. Ad Type: General
|

With GovernmentContracts, you can:
...is proposing to rehabilitate the pedestrian pathway and its associated railings, stabilize the ...
Westchester County
Bid Due: 6/18/2026
...with a new facade, entry stairs, doors, and railings shall be demolished and ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/11/2026
...submission will not be considered. Work consists of replacement of damaged white thermoplastic ...
Port Chester village
Bid Due: 7/02/2026