| Location: | Florida |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Apr 1, 2026 |
| Agency: | City of Bradenton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Progressive Design-Build Services for Lift Station 8 Relocation and Collection System Improvements Phase 1
Addenda: 0
Release Date: 3/11/2026
Due Date: 4/1/2026
The City of Bradenton is seeking proposals from qualified respondents to provide progressive design build services to furnish and install a replacement facility for the existing Lift Station 8 Relocation and Collection System Improvements Phase 1, which shall include an upsized lined wet well, new pumps, upsized discharge piping and all necessary electrical and instrumentation components. The new location will be constructed at 1302 4 th Ave W Bradenton, FL 34205.
The existing lift station sits 12 feet from the Manatee River and is located in an AE FEMA flood zone. As part of the City's ongoing resiliency efforts and hardening of the sanitary collection system, it is prudent to move the lift station out of the floodplain. The City has received grant funding for a portion of the design-build effort and the project is subject to AIS, Davis-Bacon, and other State and Federal requirements attached to funding.

With GovernmentContracts, you can:
..., moves, adds, and changes in the wiring infrastructure of the City data, ...
City of Doral
Bid Due: 9/28/2026
.... 1 has been attached. This Addendum moves the date of the posting ...
State Government of Florida
Bid Due: 9/10/2070
.../2010 - Attached Addendum 1, which moves the posting time of the intended ...
State Government of Florida
Bid Due: 10/11/2070
...as exhibitors and vendors move from booth-to-booth meeting with Agency Buyers and Administrators...
Volusia County
Bid Due: 11/04/2026