Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations

Location: California
Posted: Mar 10, 2026
Due: Apr 2, 2026
Agency: City of Palo Alto
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations

Addenda: 0

Release Date: 3/10/2026

Due Date: 4/2/2026

Follow
Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations
Invitation for Bid- Construction
Public Works-Engineering Services
91200 , 91300
Project ID: 197180
Release Date: Tuesday, March 10, 2026
ยท Due Date: Thursday, April 2, 2026 3:00pm
Posted Tuesday, March 10, 2026 11:57am
All dates & times in Pacific Time
Draft Response No Bid22 days, 21 hours, 4 minutes


Post Information

Posted At:Tue, Mar 10, 2026 11:57 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The Storm Drainage System Replacement and Rehabilitation Project (SD-25000) has 2 project locations. The first is on Alester Avenue from Hamilton Avenue to Dana Avenue and the second is on Lambert Avenue and Birch Street. Based on the history of flooding in the area, this project proposes to upsize of the existing 12-inch line to 36-inch pipe for additional storage capacity. Pipe replacement in the streets may require additional work such as striping, sidewalk, curb and gutter, and curb ramp due to the location of the existing storm drain pipes. Due to the upsizing of the pipes, the connected catch basins will have to be removed and replaced.



Background

The Storm Drainage System Replacement and Rehabilitation Project proposes on 2 locations. The first location on Alester proposes to upsize 283 linear feet of 12-inch reinforced concrete (RCP) pipe to 36-inch high density polyethylene (HDPE) pipe on Alester Avenue. The pipe would need to a 36-inch HDPE stub coming off of a junction box at Hamilton Avenue and Alester Avenue where a different contractor on another project. The catch basins, laterals, and ADA ramps will need to be replaced as a result of this upsizing. One of the main challenges is the location since the project is located next to the elementary school, the Contractor would have to adhere to the bell schedules if work is scheduled for the school year or work can done during summer when school is not in session. The second location on Lambert and Birch proposes to replace the catch basin and laterals, and install a new manhole structure in the street.



Timeline

Bid Post Date:
March 10, 2026
Question and Clarifications Due Date and Time:
March 23, 2026, 1:00pm
City's Responses to Questions:
March 26, 2026
Bid Due Date and Time:
April 2, 2026, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Last Updated: May 18, 2026 Bid Orientation: N/A Description: Construct asphalt/concrete speed..., posts, ...

City of Stockton

Bid Due: 6/11/2026

...to resurface existing asphalt concrete pavement within the Cal-Gisler neighborhood, including... the milling ...

City of Oroville

Bid Due: 6/23/2026

...Project ID: Title: The Wave Concrete Deck Replacement Project (CIP No. 8398) Addenda: ...

City of Vista

Bid Due: 7/01/2026

...minutes Post Information Posted At:Wed, May 20, 2026 3:32 PM Sealed Bid Process:Yes ...

City of Pacifica

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.