| Location: | New Jersey |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Oct 17, 2025 |
| Agency: | Delaware River Port Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Authority hereby invites interested professional consulting engineering firms to submit a Statement of Qualifications ("SOQ") for CMS for Contract 5-G PATCO Row Embankment Restoration, Drainage Improvements and Retaining Wall Rehabilitation Project (the "Project"). This public advertisement constitutes the Authority’s formal solicitation to determine the interest of qualified firms in the aforementioned project.
Advertisement Date: September 19, 2025
Statement of Qualification Due Date: October 17, 2025
I. INTRODUCTION
The Delaware River Port Authority (“Authority” or “DRPA”) is a bi-state corporate instrumentality of the State of New Jersey and the Commonwealth of Pennsylvania. The DRPA owns and operates four major toll bridge crossings of the Delaware River; the Benjamin Franklin Bridge, the Walt Whitman Bridge, the Commodore Barry Bridge, and the Betsy Ross Bridge. Each bridge facility includes office buildings, maintenance shops, garages, and other buildings and structures. In addition, the DRPA owns real property in the vicinity of the bridges. The Authority’s transit subsidiary, PATCO, operates a rapid transit line providing public transport service between Philadelphia and Southern New Jersey.
Additional information about the DRPA and its operations may be obtained by reviewing annual reports available on the DRPA’s website at www.drpa.org, “About DRPA, Annual Reports.”
II. PURPOSE AND INTENT
The Authority hereby invites interested professional consulting engineering firms to submit a Statement of Qualifications (“SOQ”) for CMS for Contract 5-G PATCO Row Embankment Restoration, Drainage Improvements and Retaining Wall Rehabilitation Project (the “Project”). This public advertisement constitutes the Authority’s formal solicitation to determine the interest of qualified firms in the aforementioned project.
Construction layout and surveying, tree removal, clearing and grubbing, traffic control, Ballast placement, slope stabilization consisting of riprap stone, vegetation, embankment cut and fill, removal existing GEO cell, top soil, seeding, mulching and fertilizing, silt fence, and stone construction entrance, inlet protection, pavement replacement, non-vegetative surface, removal of guardrail, installation of new guardrail with anchorage and end terminal, removal existing fence, installation new fence with gates and anti-climb assembly and fence repairs, removal of handrail and installation of new handrail, removal of existing concrete cap, installation of new concrete cap, concrete wall resurfacing, and drill and grout reinforcement, concrete spall repair, pressure injection crack repair, sealing of exposed concrete surfaces, permanent sheet pile retaining wall installation, existing wall removal, clean existing pipes and inlets, surface exploration and testing, install new concrete sidewalk and curb, vibration control and mitigation, Joint sealer asbestos – PCB removal.
The Authority intends to establish a short list of consultants to receive a Request for Proposal (“RFP”) and to engage a consultant for this Project.
III. TERM OF ENGAGEMENT
It is expected that the term of engagement for the Project will be approximately 22 months, which shall commence as of the date of execution of an Agreement following the RFP process.
IV. REQUESTED INFORMATION
The SOQ shall describe, in five (5) pages or less the following:
A. Firm Profile and Experience
1.) Indicate the date your firm was established.
2.) Provide general background information about the firm and a summary of its qualifications and experience, with a special focus on the qualifications of key personnel and any subconsultants.
3.) Provide the proposed project management team and staffing and submit resumes of key personnel (resumes of key personnel will not count toward the ten (10) page submission limit).
4.) Briefly describe similar assignments successfully completed in the last five (5) years by the firm and the key personnel.
6.) Provide the firms current workload.
7.) Location of the office to which this Project would be assigned.
B. Information regarding any prior work on behalf of the Authority by the firm or any individual who is listed in the SOQ.
C: Firm adheres to understanding of the project requirements.
V. SOQ SUBMISSION AND DUE DATE
One (1) electronic copy of the written SOQ and U.S. Government Forms SF330 must be submitted, in PDF format, electronically via the Ariba Network no later than 2:00 PM EST, Friday, October 17, 2025
LATE, FAXED, E-MAILED, AND/OR HARDCOPIES WILL NOT BE ACCEPTED. The Ariba submission requirement is mandatory and non-waivable.
In order to participate in this SOQ and receive an invitation to the solicitation event, please send a request, via e-mail, to the following Contracting Officer: Marjory M. McCoy - mmmccoy@drpa.org. If a response is not received within two (2) business days, please resend the request and copy to vendors@drpa.org on your e-mail.
In order to access the SOQ event, you must be registered on the Ariba Network and have completed the Authority's supplier registration questionnaire. If you have not already done so, you can register on the Ariba Network at any time. Registration is free, quick, and easy. To do so follow the below steps:
Submit a self-registration request at http://drpa.sourcing.ariba.com/ad/selfRegistration.
After the self-registration request that you submitted is approved, you’ll receive an email from Ariba.
After you create your username and password, please email (project owner) and they will send you an invite to the event.
If you need any assistance or have questions, please email vendors@drpa.org.
If your company is already registered in Ariba, please log in through invite with that information to sync our accounts.
Firms should ensure that they can access and upload files in Ariba prior to the submission deadline. It is the respondent’s responsibility to ensure submission of its SOQ to the proper place at the proper time. Absent an emergency or unanticipated event that interrupts normal Authority processes so that SOQs cannot be received via Ariba by the exact time specified in the SOQ, the Authority will not extend the submission deadline for an interested firm due to its technical difficulties.
VI. SINGLE POINT OF CONTACT
The DRPA has established a Single Point of Contact for this SOQ. From the issue date of this advertisement, the Single Point of Contact shall be the Contracting Officer whose name and contact information appears below. Please refer all inquiries related to the to the Contracting Officer.
Any violation of this condition (excluding any Ariba supplier registration questions, which should be addressed by e-mailing vendors@drpa.org) may be cause for the Authority to reject the offending firm. Respondents agree not to distribute any part of their SOQ beyond the Authority’s Contract Administration Department. A Respondent that shares information contained in its SOQ with other Authority personnel may be disqualified and its SOQ may be rejected.
The Single Point of Contact for this Project is:
Marjory M. McCoy, Contract Administration
mmmccoy@drpa.org
856-968-2082
VII. EVALUATION OF SOQs
All SOQs will be reviewed to determine responsiveness. The Authority may reject non-responsive SOQs without evaluation but may waive minor non-compliance.
All SOQs will be reviewed by an Evaluation Committee who will make recommendations regarding which Respondents the Committee believes to be qualified. The evaluation team will evaluate and rank each SOQ considering the following factors; the order of factors should not be considered determinative of importance:
A. Understanding and Approach
B. Qualifications and Experience
C. Overall Completeness and Quality of SOQ
D. Maintenance of a local office
The Authority will establish a short list of consultants to receive an RFP and to engage a consultant for this Project.
The final determination will be based on the Authority’s evaluation, in its sole judgment, of which SOQs best meet the needs of the Authority.
This SOQ does not commit the Authority to awarding a Contract. Respondents shall bear all costs incurred in the preparation of the SOQs and participating in the SOQ process. The Authority reserves the right to reject any and all SOQs, the right in its sole discretion to accept the SOQs it considers most favorable to the Authority’s interests, and the right to waive minor irregularities. The Authority reserves the right to reject all SOQs and seek new SOQs when such procedure is reasonable and in the best interests of the Authority. In addition, the Authority may at any time revoke this SOQ in its sole discretion and without assuming any liability in connection with its issuance and/or revocation.
VIII. EQUAL OPPORTUNITY
The Delaware River Port Authority is firmly committed to providing full and equal business opportunities to all persons regardless of race, color, religion, gender, and national origin.
DELAWARE RIVER PORT AUTHORITY
By: Amy L. Ash
Manager, Contract Administration
Phone: 856-968-2084

With GovernmentContracts, you can:
...of the solicitation, NAICS 334419. Technical Data Package and Export Control Requirements This ...
DEPT OF DEFENSE
Bid Due: 6/03/2026
...Street, Camden, NJ 08102. Bin access is M-F, 8:30 AM to 4:00 PM ...
County Camden
Bid Due: 6/30/2026
..., infrastructure for access control, security cameras and related Work at the new ...
Port Authority of New York and New Jersey
Bid Due: 6/16/2026
...entrance of the Courthouse at 520 Market Street, Camden, NJ 08102. Bin access ...
County Camden
Bid Due: 6/12/2026