| Location: | Washington |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Apr 3, 2026 |
| Agency: | King Conservation District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The King Conservation District (KCD) is seeking the services of a qualified contractor (Contractor) to complete the King Conservation District Hilltop Park (Burien) Restoration Project. This Project involves the treatment and control of invasive blackberry and other pervasive woody weed species and planting and planting approximately 475 trees and 2500 shrubs in cleared areas in Hilltop Park located in Burien, WA. The total project area is approximately 2.81 acres.
This Project consists of:
We anticipate the project schedule to extend from Spring 2026 to Winter 2026-27 with monitoring and maintenance through 2028.
A pre-bid meeting is available Monday, March 23 at 10:30AM at Hilltop Park (2450 S 128th St, Burien, WA 98168)
Please submit bids by 6:00pm, Friday, April 3 by emailing ellen.arnstein@kingcd.org .
All bids must conform to the request for bid format by completing and signing the bid form linked below.
Please fill out the attached form if you are not already on KCD’s Riparian and Forestry Small Works Roster

With GovernmentContracts, you can:
...Bid Number: PW-0157 Bid Title: SAMMAMISH RIVER & WAYNITA CREEK RESTORATION Category: Request...
City of Bothell
Bid Due: 6/29/2026
...RFP | Fish and Wildlife, On-call River Restoration Engineering/Design Services | Closing Date ...
The Confederated Tribes of the Colville Reservation
Bid Due: 6/26/2026
...installation, channel reconstruction, channel re-alignment, streambed restoration, roadside... restoration, erosion control, water management ...
State Government of Washington
Bid Due: 7/16/2026
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026