Turnpike Road Culvert Replacement (#22, #24, #25, #29, and #30) and Stormwater Ditching Project

Location: Vermont
Posted: Jun 16, 2026
Due: Jul 9, 2026
Agency: State Government of Vermont
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Turnpike Road Culvert Replacement (#22, #24, #25, #29, and #30) and Stormwater Ditching Project Request Date: 6/16/2026 11:38:33 AM
Open Date:
Closing Date: 7/9/2026 1:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:

Town of Norwich

300 Main Street
Norwich ,
VT 05055

Bid Type:
Request for Proposal

Locations:
Windsor
Keywords:
Culvert Replacement

Bid Description:
The Town of Norwich, VT is seeking bids for the replacement of five existing undersized 15-inch round culverts (#22, #24, #25, #29 and #30) on Turnpike Road.

The Town would like to have the project completed as soon as possible, no later than September 30, 2026.

RFP documents may be obtained from the Town of Norwich website via the link below or at the Town Hall located at 300 Main Street, Norwich, VT.

Bids are due no later than Thursday, July 9, 2026 at 1:00 p.m. ET.

Please review the RFP document for complete project details and submission requirements.
Special Instructions:
If you are considering entering a bid for this work, please notify Chris Kaufman: ckaufman@norwich.vt.us

Bids are due by Thursday, July 9, 2026 at 1 PM. Bids shall be submitted in a sealed envelope addressed to the Town Manager, Town of Norwich at P.O. Box 376, Norwich, VT or can be hand delivered to the Town of Norwich at 300 Main St. Norwich, VT 05055.
Contact Information:
Chris Kaufman
Phone: (802) 649-2209
Fax:
Email: ckaufman@norwich.vt.us
For additional information: norwich.vt.us/wp-content/uploads/2026/06/Request-for-Bid_Culvert-Replacement-22_24_25_29_30-_-Turnpike-Rd_06162026.pdf
Bid Attachments:
RFP_Culvert Replacement_Turnpike Rd_Pgs.1-5.pdf

RFP_Culvert Replacement _Turnpike Rd_Pgs.6-8.pdf

RFP_Culvert Replacement_Turnpike Rd_Pgs.9-10.pdf

RFP_Culvert Replacement _Turnpike Rd_Pgs.11-12.pdf

Site Visit: Date:

Although a site visit is not mandatory, it is highly recommended due to the nature of the work. Please reach out to Chris Kaufman directly to schedule a visit: ckaufman@norwich.vt.us

Attachment Preview

REQUEST FOR BIDS
TURNPIKE ROAD CULVERT REPLACEMENT - #22, #24, #25, #29, #30 AND
STORMWATER DITCHING PROJECT
TOWN OF NORWICH, VERMONT
Issued: June 16, 2026
Project Location
Culverts 22, 24, 25, 29, and 30 are located on Turnpike Road in the Town of Norwich, Vermont. The
following existing culverts to be replaced are shown in Figure 1. The approximate longitude and
latitude of each culvert is as follows:
1. Culvert 22 - 43.746700, -72.326000.
2. Culvert 24 - 43.750190, -72.327700.
3. Culvert 25 - 43.753200, -72.328700.
4. Culvert 29 - 43.760800, -72.330000.
5. Culvert 30 - 43.761500, -72.330100.
Project Description (Existing Conditions)
Existing culverts 22, 24, 25, 29, and 30 are undersized and need to be replaced with new culverts.
The condition of each culvert is described below:
1. Existing culvert 22 is a round, 15-inch diameter steel culvert that is approximately 30 feet in
length and in fair condition.
2. Existing culvert 24 is a round, 15-inch diameter steel culvert that is approximately 35 feet in
length and in poor condition
3. Existing culvert 25 is a round, 15-inch diameter steel culvert that is approximately 35 feet in
length and in fair condition
4. Existing culvert 29 is a round, 15-inch diameter plastic culvert that is approximately 50 feet in
length and in fair condition
5. Existing culvert 30 is a round, 15-inch diameter plastic culvert that is approximately 50 feet in
length and in fair condition
Project Work to be Completed and Project Specifications
The culverts will be replaced as follows:
1. Existing culvert 22 will be replaced with an 18-inch ADS HP Storm Dual Wall Gray Pipe that
will be approximately 35 feet in length. Final lengths shall be verified by the contractor.
2. Existing culvert 24 will be replaced with an 18-inch ADS HP Storm Dual Wall Gray Pipe that
will be approximately 35 feet in length. Final lengths shall be verified by the contractor.
3. Existing culvert 25 will be replaced with a 24-inch ADS HP Storm Dual Wall Gray Pipe that will
be approximately 40 feet in length. Final lengths shall be verified by the contractor.
Request for Bids Turnpike Rd Culvert Replacement 22, 24, 25, 29, 30 and Stormwater Ditching
Page 2
4. Existing culvert 29 will be replaced with an 18-inch ADS HP Storm Dual Wall Gray Pipe that
will be approximately 50 feet in length. Final lengths shall be verified by the contractor.
5. Existing culvert 30 will be replaced with an 18-inch ADS HP Storm Dual Wall Gray Pipe that
will be approximately 50 feet in length. Final lengths shall be verified by the contractor.
In each location as detailed above, the existing culverts will be excavated, removed, and disposed of
by the contractor.
Existing backfill will be removed from the trench excavation site by the contractor. Trench bottoms
containing bedrock, soft muck, refuse, or other material unable to provide long-term uniform pipe
support are unacceptable. All unsuitable foundation materials should be excavated before the new
culvert pipe installation proceeds. The contractor should remove rock or unyielding material 1-foot
below grade and 6 inches on either side of pipe. Soft areas within the foundation should be removed
approximately 2 feet below grade and three times pipe width. A synthetic fabric (geotextile) will be
required to separate unsuitable native soil from backfill material.
Excavation will occur at each culvert location using the lines and grades of the existing culverts unless
final cover depth requirements or site conditions dictate adjustments be made. Minimum trench
cover depth and width requirements for the new culvert pipes will be as shown on the Trench
Installation Detail in Attachment No.1.
Trenching work (if required) will be required to follow OSHA requirements per 29 CFR 1926.651 and
1926.652 or comparable OSHA-approved state plan requirements.
A minimum of 4 inches of bedding material will be used prior to placing the new culvert pipe. The
pipe bedding material will either a fine graded crushed gravel meeting the requirements VTrans
704.05B or sand borrow meeting the requirements of VTrans 703.03A.
All culverts described above will be replaced with ADS HP Storm Dual Wall Gray Pipe or
approved equivalent. Refer to the ADS Corrugated Plastic Pipe Storm Installation Guide for
installation details.
An initial backfill material will be used to backfill around the pipe. This initial backfill material will be a
fine graded crushed gravel meeting the requirements of VTrans 704.05B. The backfill material will be
carefully haunched around the pipe to eliminate voids. The initial backfill material will be compacted
with appropriate compaction equipment to a minimum 6 inches above the pipe.
The remaining final cover can be suitable material removed from the original excavation that is free of
organics, refuse, muck, wet, and clayey soils. Soils should be placed in layers that are no thicker
than 6-8 inches and compacted (utilizing water if necessary). The top final 4-inches should be a ¾-
inch gravel hardpack material (as approved by the Owner).
The culvert inlets and outlets should be armored to prevent erosion and channelization. Armoring
should be made with erosion stone meeting the requirements of VTrans 706.04 (size will be a
minimum of 7 inches or greater as approved by the Owner). The extent of the armoring will depend
on the topography and specific onsite conditions, but in general placed around the entire pipe ends
extending from the pipe inlet and outlet ends to an extent no less than 12 linear feet (on either side of
the inlet channel) and on the downstream side of the culvert. Steep outfall topography may dictate
additional armoring and should be anticipated.
In areas where roadside shoulders are present, the shoulders should be re-installed as similar to
Request for Bids Turnpike Rd Culvert Replacement 22, 24, 25, 29, 30 and Stormwater Ditching
Page 3
adjacent areas in depth and type of gravel.
New metal culvert pipe markers (with reflectors) will be required to be installed on either side of the
new pipe. These markers should be approved by the DPW Director. The location of the new culvert
pipe should be documented, and coordinates provided to the DPW.
Stormwater ditching should be completed in the following locations:
1. Culvert 22 should be ditched on the upstream side approximately 25 linear feet north.
2. Culvert 24 should be ditched on the west side north of the culvert approximately 50 linear feet.
3. Culvert 25 should be ditched 25 linear feet on the south end and 125 linear feet on the north end
4. Culvert 30 should be ditched on the east side approximately 140 linear feet.
Stormwater ditches between 0% and 5% are to be grass-lined. For ditches between 5% and 8%,
the ditches should be grass-lined with stone check dams. Check dams cannot be greater in height
than 2 feet, center of dam lower than ends, 2:1 side slope, mixture of 2-inch to 9-inch stones and
spanning the width of the channel. For ditches greater than 8% the ditches should be stone lined
with 6-inch to 8-inch minus. Any excess ditch spoils should be removed offsite and included in the
bid price.
The road can be closed for excavation and installation of the new culverts but will require
advanced notification of at least 5 days from the Public Works Director to allow public
notification. Closure signs will need to be posted in both directions at least 5 days in
advance of work. Traffic control will be required as necessary and all traffic control delineation,
traffic signs, and flagging will be required to follow the MUTCD latest edition.
All construction work will be performed in accordance with the technical requirements of the Vermont
Agency of Transportation 2024 Standard Specifications for Construction. Payment for the work shall
be based on the pay units and unit prices defined in the bid tabulation and the Request for Bids.
Intention Of Terms
The Town would like to have the project completed as soon as possible, but in no case no later than
September 30, 2026.
All work shall be performed within the existing right-of-way limits, which are approximately 25 feet on
each side of the road centerline. No additional R.O.W. are anticipated for this work.
Bidding Notification
If you are considering entering a bid for this work, please notify Chris Kaufman at the following
email address: ckaufman@norwich.vt.us. The Town will use this notification to contact you or
your firm in the event that there is a change to the project, bid addenda, or bid schedule.
Site Visit
Although a site visit is not mandatory, it is highly recommended due to the nature of the work.
Please reach out to Chris Kaufman directly to schedule a visit.
Request for Bids Turnpike Rd Culvert Replacement 22, 24, 25, 29, 30 and Stormwater Ditching
Page 4
Questions Due Date
Questions may be submitted by email to Chris Kaufman at the following address:
ckaufman@norwich.vt.us. The due date for questions is Wednesday, July 1, 2026, at 3:00 PM.
Bid Submission and Due Date
Bids are due by Thursday, July 9, 2026, at 1:00 PM (prevailing time). Bids shall be submitted in a
sealed envelope addressed to the Town Manager, Town of Norwich at PO Box 376, Norwich VT,
05055 or can be hand delivered to the Town of Norwich at 300 Main St, Norwich, VT 05055. The
envelope should be plainly marked with the name of the bid. Bid proposals will be date stamped
on the outside of the envelope immediately upon receipt by the Town. Any bid may be withdrawn
in writing prior to the scheduled time for the opening of the bids. Any bid received after the date
and time specified will not be considered and will be returned to the bidder unopened. Any
exceptions to the bid specifications or proposed work as described must be noted by the bidder.
A bidder submitting a bid certifies that the bid was made in good faith without fraud, collusion, or
connection of any kind with any other bidder for the same work, and that the bidder is competing
solely on his/her behalf with connection with or obligation to any undisclosed person or firm.
Project Schedule
The Town intends to open bids on July 9, 2026, at the Town Office; and the Selectboard intends
to select a contractor no later than July 22, 2026.
Bid Information
Please provide:
A description of proposed approach to the project
Proposed traffic control measures
Completed bid tabulation
Proposed start and completion dates for all work
A list with descriptions of similar work performed
Two references, with contact information, who are familiar with similar work performed
Bid Opening
Every bid received prior to the bid submission deadline will be publicly opened and read aloud and
recorded by the Town Manager and the respective Department Head.
Criteria for Bid Selection
In evaluating bids, the Town will consider the following criteria:
Price
Bidders’ ability to perform within the specified time limits
Bidders experience and reputation, including past performance for the Town
Quality of the materials and services specified in the bid
Bidder’s ability to meet other terms and conditions, including insurance and/or bond requirements
Bidder’s financial responsibility
Bidder’s availability to provide future service, maintenance, and support
Request for Bids Turnpike Rd Culvert Replacement 22, 24, 25, 29, 30 and Stormwater Ditching
Page 5
Nature and size of the bidder
Contract provisions that are acceptable to the Town
Bidder is not on any debarment list related to goods and services the bidder provides
Any other factors that the Town determines relevant and appropriate in connection with the project
A low bid does not guarantee award of the contract.
Penalty for Late Completion
For every day that actual completion of the project is past the contractor’s proposed completion date,
excluding rain dates or issues beyond the contractor’s control, $100 may be deducted from the
Town’s payment.
Insurance
Prior to starting work the selected bidder will be required to provide a Certificate of Liability
Insurance with commercial general liability coverage of no less than $1,000,000 per occurrence
and $2,000,000 per aggregate, naming the Town of Norwich as an additional insured. The
Certificate must also include Workers Compensation Insurance.
Payment Schedule
One invoice is to be submitted following the completion of all work and inspection by the Town’s Public
Works Director.
Town Contact
Questions may be directed to Chris Kaufman at the following address:
ckaufman@norwich.vt.us.
The Town reserves the rights to select any bid for any reason, and to reject any or
all bids.
The Town also reserves the right to award any portion of the work as listed in the
Project Description and Bid Form.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Turnpike Rd Culvert Replacement Request Date: 7/8/2026 8:28:12 AM Open Date: 8/3/2026 Closing ...

State Government of Vermont

Bid Due: 8/03/2026

...Trout Brook Access Road Culvert Improvement Final Design Request Date: 7/14/2026 12:00:51 PM ...

State Government of Vermont

Bid Due: 8/04/2026

...: Chittenden Keywords: Construction (Non Building) Bid Description: REHABILITATION OF EXISTING CULVERT AND...

State Government of Vermont

Bid Due: 8/07/2026

...NORTH OF THE INTERCHANGE WITH US ROUTE 2. TYPE OF CONSTRUCTION: REHABILITATION OF ...

State of Vermont - Agency of Transportation

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.