Project Description: This Contract provides for the improvements of the Intersection of Mill Plain Boulevard and MacArthur Boulevard, the Intersection of MacArthur Boulevard and Blandford Drive, the
Segment of MacArthur Boulevard between the two aforementioned Intersections, and Intersection Approaches as shown on The Plans. The Project includes clearing and grubbing,
roadway excavation, stormwater conveyance, treatment, water main, sanitary sewer main, paving with HMA and concrete, irrigation systems, erosion control, curb/gutter, sidewalk,
traffic control, pavement marking, traffic signal system, interconnect system, illumination system, and landscaping and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
The Contract Work shall be Physically Complete within 260 Working Days from the Notice to Proceed.
Engineer's Estimate - $7,770,00

With GovernmentContracts, you can:
...curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing..., ...
State Government of Washington
Bid Due: 10/21/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/23/2026
...of dewatering the site, providing erosion control, excavating the existing dike soil and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
...and restoration of a portion of Clear Creek, as well as a temporary ...
State Government of Washington
Bid Due: 11/04/2026