Project Description: This Contract provides for the improvements of the Intersection of Mill Plain Boulevard and MacArthur Boulevard, the Intersection of MacArthur Boulevard and Blandford Drive, the
Segment of MacArthur Boulevard between the two aforementioned Intersections, and Intersection Approaches as shown on The Plans. The Project includes clearing and grubbing,
roadway excavation, stormwater conveyance, treatment, water main, sanitary sewer main, paving with HMA and concrete, irrigation systems, erosion control, curb/gutter, sidewalk,
traffic control, pavement marking, traffic signal system, interconnect system, illumination system, and landscaping and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
The Contract Work shall be Physically Complete within 260 Working Days from the Notice to Proceed.
Engineer's Estimate - $7,770,00

With GovernmentContracts, you can:
...concrete gravity sewer main and eleven 48-inch diameter concrete manholes. the Contractor shall ...
City of Vancouver
Bid Due: 9/22/2026
..., equipment, materials, and incidentals required to rehabilitate the existing sewer mains with ...
City of Vancouver
Bid Due: 9/15/2026
...of approximately 147 lineal feet of 8-inch PVC gravity sewer main. Restoration of ...
Moses Lake city
Bid Due: 9/01/2026
..., sanitary sewer piping and structures, water main installation, HMA pavement, permanent signage, ...
City of Wenatchee
Bid Due: 9/16/2026