| Location: | Vermont |
|---|---|
| Posted: | Nov 20, 2024 |
| Due: | Dec 13, 2024 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Orange, Washington Keywords: Construction (Non Building), Paving Contractor, Road Construction Bid Description: BARRE TOWN-ORANGE STP PS23 (1) BEGINNING IN THE TOWN OF BARRE TOWN ON US ROUTE 302 AT STATION B 0+18.00 (MM 0.003) EXTENDING EASTERNLY 49,725.27 FEET (9.418 MILES) TO THE TOWN OF ORANGE AT STATION 0 321+65.00 (MM 6.092) WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES PAVEMENT RESURFACING, SHOULDER WIDENING AND NARROWING, PAVEMENT MARKINGS, GUARDRAIL, SIGNS, AND OTHER HIGHWAY RELATED ITEMS. ORANGE-TOPSHAM STP FPAV (56) BEGINNING ON US ROUTE 302 IN THE TOWN OF ORANGE AT MM 6.092 AND EXTENDING EASTERLY ALONG US ROUTE 302 FOR A DISTANCE OF APPROXIMATELY 9,794.40 FT (1.855 MILES) TO MM 1.676 IN THE TOWN OF TOPSHAM. WORK TO BE PEFORMED UNDER THIS PROJECT INCLUDES COARSE-MILLING AND RESURFACING THE EXISTING HIGHWAY, GUARDRAIL IMPROVEMENTS, PAVEMENT MARKINGS, AND OTHER RELATED HIGHWAY ITEMS. ENGINEERS CATEGORY F
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Owner's Rep/Construction Manager Request Date: 7/16/2026 9:48:24 AM Open Date: 7/16/2026 Closing...: Consultant ...
State Government of Vermont
Bid Due: 8/10/2026
...Kennedy Drive Pond 7 Stormwater Improvements Construction Request Date: 7/22/2026 2:54:49 PM Open... ...
State Government of Vermont
Bid Due: 8/28/2026
...Lake Forest Condos Stormwater Improvement Project Construction Request Date: 7/15/2026 10:52:16 AM... Winooski ...
State Government of Vermont
Bid Due: 8/07/2026
...Keywords: Bridge Repair and Construction, Road Construction Bid Description: Replacement of Bridge No.../contract-admin/bids-requests/construction-contracting ...
State Government of Vermont
Bid Due: 8/21/2026