| Location: | Missouri |
|---|---|
| Posted: | Jan 9, 2025 |
| Due: | Jan 24, 2025 |
| Agency: | GENERAL SERVICES ADMINISTRATION |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 47PG0125R0003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SERVICE: Lawn and Grounds Maintenance Services
LOCATION(S): FEDERAL BUILDINGS
1500/2306/2312 EAST BANNISTER ROAD,
601/701 EAST 12TH STREET, 8930 WARD PARKWAY
KANSAS CITY, MISSOURI
500 STATE STREET, 850 NEBRASKA
KANSAS CITY, KANSAS
SERVICE: Snow Removal Services
LOCATION(S): FEDERAL BUILDINGS
601/701 EAST 12TH STREET, 300/400 EAST 9TH STREET
KANSAS CITY, MISSOURI
500 STATE STREET, 850 NEBRASKA
KANSAS CITY, KANSAS
NAICS: 561730 LANDSCAPING & SNOW REMOVAL SERVICES
Full and Open Competition
Base Period of Performance (Anticipated): April 1, 2025 - October 31, 2025
Potential Ultimate Expiration Date (Assuming All Options Exercised) October 31, 2029
This scope of work is organized in two parts: Part I- Lawn & Grounds and Part II- Snow Removal. The Contractor shall provide all personnel, supplies, equipment, supervision, etc. to meet contract requirements as described herein. The Contractor shall:
If the COR deems a piece of equipment unsafe or in disrepair, the Contractor shall immediately stop using the piece of equipment and remove it from the site(s)
The contractor shall furnish all necessary labor, materials, supplies, equipment and supervision to provide lawn, tree, shrub, flower and field maintenance as described within the official statement of work for the following Federal Buildings:
PART II – Snow Removal
Description of Work
The contractor shall furnish all necessary labor, materials, supplies, equipment and supervision to provide snow and ice pushing/removal/hauling/disposal as described herein for Federal Buildings, 601/701 East 12th Street and 300/400 E 9th Street in Kansas City, Missouri, and Federal Buildings, 500 State Ave and 850 Nebraska Ave in Kansas City, Kansas. The Government may add other building(s), or work to this contract. All changes will be negotiated.
The Contractor shall perform snow and ice removal from entrances, steps, landings, sidewalks, driveways, plaza areas, roadways, parking areas, paved areas, handicap accessible areas and approaches. This includes snow and ice removal requiring heavy equipment (ride-on equipment such as front end loaders, backhoes, skid loaders, snow plows, trucks, trailers etc.).
The Contractor shall “automatically” commence snow removal operations when there is accumulation of 2 (two) inches or greater of snow, unless called sooner by the COR. It is the contractor’s responsibility to monitor weather forecasts and conditions and execute services accordingly.
GSA reserves the right to:
If the COR orders services sooner, the Contractor shall move their equipment to the site and begin work within a maximum of two (2) hours after service is ordered. The contractor shall keep necessary equipment and manpower at the site and continue with the performance of the snow removal until it is completed to the satisfaction of the COR.
The Contractor shall clear snow and ice before and during the normal building operating hours to prevent a slip hazard. Work completed during the evening shall be completed to such an extent as to allow safe and easy access and will be inspected at the following times:
601 and 701 E. 12th Street: 5:30 a.m.
300 and 400 E. 9th Street: 6:30 a.m.
500 State Street: 6:30 a.m.
850 Nebraska: 6:30 a.m.
Work completed during the day shall be inspected as determined by the COR. For work completed in the evening and otherwise, the COR will inspect the work following notification of completion.
Salt, or synthetic equivalent, shall be applied to the entrances, steps, landings, sidewalks, handicap ramps, parking and driving areas in sufficient amounts to ensure safe walking and driving areas and to reduce safety hazards due to freezing rain and snow unless called sooner by the COR.
VENDOR REQUIREMENTS TO QUALIFY TO SUBMIT PROPOSAL
Please note, these are not all the evaluation factors. The listed factor is the minimum experience requirement to be able to qualify for a potential award. The Government will identify all evaluation factors in an upcoming RFP.
Work Experience
To receive consideration for award, the offeror as the prime contractor, shall submit two (2) work experience references. References shall be submitted using the Worksheet for Submitting Work Experience (Attachment 3). These references will be evaluated as follows:
One (1) reference must be from a current and/or previous lawn and grounds maintenance contract performing a similar service in multiple location(s), with whom you have had a continuous working relationship for not less than two (2) years within the last five (5) years.
Additionally, one (1) reference must be from a current and/or previous snow removal contract performing a similar service in a multiple location(s), with whom you have had a continuous working relationship for not less than two (2) years within the last five (5) years.

With GovernmentContracts, you can:
...Bid Information Type Invitation for Bid Status Issued Number 26-093 (Logo Shirts) Issue ...
Springfield Public Schools
Bid Due: 6/08/2026