| Location: | South Carolina |
|---|---|
| Posted: | Apr 28, 2026 |
| Due: | May 14, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H27-N434-SB |
| Publication URL: | To access bid details, please log in. |
Removal and Replacement with a two-ply granular surfaced modified bitumen roof system for all roof areas for approximately 755 squares (SQS). All associated sheet metal components and acc. included. Complete removal and replacement of all exterior sealant joints, wet sealing all glass fenestrations, and maintenance/repairs to lintels/shelf angles/exposed structural steel. Additional information can be found on the USC Supplier Portal.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Location: 1000 Blossom Street, Columbia, Sc 29208 Project Delivery Method: Design-Bid-Build Construction...@mailbox.sc.edu Telephone: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...29303 Project Delivery Method: Design-Bid-Build Construction Cost Range: $425,000.00 - $525,000.00... Description: Roof ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...: Printed: 5 Electronic: 1 ANTICIPATED PROJECT DELIVERY METHOD: Design-Bid-Build CM-R N/A AGENCY...: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/08/2026