REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES
The Town of Woodville requests proposals from qualified firms or individuals to provide engineering services
for work related to the implementation of approved FY 2026 CDBG project(s). You are invited to submit a
proposal, in accordance with this request, to the Town of Woodville; (510 Main St., Woodville, MS 39669) no
later than _4:00 p.m. on _April 9, 2026.
The Engineer will be responsible for preparing project cost estimates for application preparation and if awarded,
the selected Engineer will provide all engineering services through project closeout in accordance with federal,
state and local laws, regulations and policies. The scope of work includes but is not limited to the following:
1) prepare plans and specifications, 2) distribute bid documents, 3) assist in bid opening and prepare bid
tabulation, 4) assist in the execution of construction contracts, 5) hold pre-construction conference, and 6)
perform construction inspection including periodic reports to the Town and approve all payment requests.
The Town of Woodville is an Equal Opportunity Employer. The Town encourages Minority-owned Business
Enterprises (MBEs) and Woman-owned Business Enterprises (WBEs) to submit proposals. The Town also
encourages Section 3 eligible businesses to submit proposals. Section 3 of the Housing and Urban Development
Act of 1968, as amended (12 U.S.C. 17010) requires, to the greatest extent feasible, that the Town and its
contractors that participate in the above referenced Program give opportunities for job training and employment
to lower incomes residents of Woodville_. Section 3 also requires that contracts for work in connection with the
Section 3 area be awarded to Section 3 eligible business concerns.
All proposals must be submitted in a sealed envelope and marked with the following language: “Proposal for
CDBG Engineering Services.” Proposals will be evaluated on the following factors: Qualifications (40 points),
Experience (40 points) and Capacity for Performance (20 points). To be evaluated properly, the following must
be addressed in detail:
Qualifications – List of qualifications of persons to be assigned to project;
Experience – Information regarding the firm’s experience and the projects previously undertaken,
including the type and amount of grants awarded, the projects activities, and the status of the projects;
Capacity for Performance – Identify the number and title of staff assigned to provide services.
The Town of Woodville will designate a selection committee to evaluate each proposal. The selection committee
may hold proposals for a period of not to exceed thirty (30) days for the purpose of reviewing the content of the
proposals and investigating the qualifications of the firms and assigned individuals. The Town reserves the right
to reject any and/or all proposals.
Subject to CDBG award(s) and the removal of all environmental conditions, the Town will award a contract with
the qualified individual or firm whose proposal has the highest number of cumulative points issued by the
selection committee and determined to be the most advantageous to the Town, price and other factors considered.
The contract will include scope and extent of work and other essential requirements. An individual contract will
be executed for each awarded project, and the contract will be on a fixed price basis. The Town has the authority
to terminate the selection at any time.