| Location: | Utah |
|---|---|
| Posted: | Jun 18, 2026 |
| Due: | Jul 5, 2026 |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA823226RB015 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Air Force Life Cycle Management Center (AFLCMC) intends to award a sole-source IDIQ contract to General Electric Aerospace for the development, qualification, test, and sustainment of the Joint Electronic Data Acquisition Interface (JEDAI) Line Replaceable Unit (LRU).
The JEDAI LRU is the required fleet-wide replacement for the Crash Survivable Flight Data Recorder (CSFDR) system for the F-16C/D Block 30/32/40/42/50/52 fleet. The current CSFDR systems are experiencing critical challenges due to aging, high failure rates, and lack of repair options, which directly impacts aircraft availability and mission readiness. This effort will establish a single, standardized LRU to create a common F-16 configuration, address exhausted spares, increase system reliability, and reduce maintenance costs. The total estimated value is $40.4M.
This notice of intent is not a request for competitive proposals. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.
Justification for Sole Source (RFO 6.104-1(a)(4))
This acquisition is being conducted on a sole-source basis under the authority of 10 U.S.C. 3204(a)(1), as implemented by the Revolutionary FAR Overhaul (RFO), which states that only one responsible source and no other supplies or services will satisfy agency requirements.
Instructions to Responding Parties
All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. Interested parties who believe they can meet the requirements are to submit a response that clearly details their capability to do so without incurring the cost and schedule impacts detailed above. Responses must be submitted by the closing date of this notice to the contracting officer.

With GovernmentContracts, you can:
...- Division of Facilities Construction and Management Type: ITB Status: Open Open Date: ...
State Government of Utah
Bid Due: 8/18/2026
..., is seeking a qualified and experienced contractor to provide Medicaid claim submission ...
State Government of Utah
Bid Due: 7/29/2026
..., is seeking a qualified and experienced contractor to provide Medicaid claim submission ...
State Government of Utah
Bid Due: 7/28/2026
...MANAGEMENT CENTER Sub Command 2 WEAPONS Office FA8213 AFLCMC EBHK Looking for contract ...
DEPT OF DEFENSE
Bid Due: 8/03/2026