| Location: | Alaska |
|---|---|
| Posted: | Jul 3, 2025 |
| Due: | Jul 10, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z085Q20394 |
| Publication URL: | To access bid details, please log in. |
Scope of Work: CGC HEALY
Oily Waste Offload
Background:
Significant amount of oily water in oily waste storage tanks due to a fire main rupture.
Statement of Work:
Vendor shall remove up to 9,000 gallons of waste oil and oily water from USCGC HEALY. Vendor shall dispose of all removed fluids in accordance with all applicable Federal, state, and local laws, ordinances, regulations.
Cutter engineers can pump off using their installed system and it would be from their shore tie connections right next to the fueling station.
The approximate connection from cutter to loading truck is 100 feet. Request contractors verify their capability once the cutter moors in Dutch Harbor.
GFE: None
POP: 7/11/2025-07/13/2025*note 1
Note 1 - work can begin on the first day of cutter arrival.
Location of work to be performed:
Municipal Pier at 1171 Airport Beach Rd, Dutch Harbor, AK 99692
Key USCG Personnel Information
The primary unit POC is Ryun Konze, USCGC Healy, (707) 815-7469, Ryun.J.Konze@uscg.mil.
Secondary POC is LT Christopher Maytum christopher.j.maytum@uscg.mil

With GovernmentContracts, you can:
Follow USCG REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (RMACC III) Active Contract Opportunity Notice
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 12/31/2026
Project: Request for Letters of Interest - Data Center and Large Power User
Matanuska-Susitna Borough
Bid Due: 6/01/2027
RFP 18-823-26 | Prevention, Preparedness, and Response (PPR) Planning & Technical Support The
State Government of Alaska
Bid Due: 6/30/2027
RFP 18-825-26 | Prevention, Preparedness, and Response (PPR) Planning & Technical Support The
State Government of Alaska
Bid Due: 6/30/2027