| Location: | Hawaii |
|---|---|
| Posted: | Apr 30, 2026 |
| Due: | May 21, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 697DCK-26-R-00221 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
GENERAL
The purpose of this project is to trim trees quarterly, removing shrubs, grass, and other vegetation, or obstructions surrounding the UPP VOR antenna to prevent interference of the radiated signal from the antenna. The tree coverage is mostly made up of tall Ironwood up to 60 feet tall. The terrain is on the mountain top and the trimmed areas are very steep which requires extra efforts to get to.
NOTE: The contractor must be aware about the Hawaiian Hawks habitat close to the UPP VOR site. The work should not be scheduled during the mating period – August-September time frame.
PROJECT DESCRIPTIONS
The contractor shall furnish all necessary labor, material, equipment, transportation, and other services needed to perform all tasks under this contract. The scope of work includes but not limited to the following items:
Cut/trim/ and mulch shrubs, trees, grass, and other vegetation up to 350’ feet radius centered on the VOR antennas and rotate as necessary 365 deg. radius around VOR antenna, As shown on the Appendix A (Google map). All vegetation on entire counterpoise must be mowed and/or poison.
All trees, shrubs, and vegetation located below the counterpoise within this area will be trimmed and shorten at least six (6) feet below the surface area (elevation 1765) of the antenna counter poise (below the antenna line of sight. All trees and vegetation within this area and FAA property will be cut down, chipped and spread within FAA property. Vegetation/grass will be mowed for ease in maintenance.
Trees outside of FAA property must be topped at least six (6) feet below the surface area (elevation 1756) of antenna counter poise (below the antenna line of sight) and removed.
Please refer to the attached Scopes of Work (SOW) and Appendix/Appendices

With GovernmentContracts, you can:
...of Work (SOW).Offer Due Date & Time06/08/2026 04:00 PMDescriptionTo cut and remove fallen ...
State Government of Hawaii
Bid Due: 6/08/2026
...ResourcesDivisionLand DivisionIslands (where the work/delivery is to be performed) HawaiiCategoryServicesRelease Date... and remove ...
State Government of Hawaii
Bid Due: 6/08/2026
...DivisionIslands (where the work/delivery is to be performed) HawaiiCategoryServicesRelease Date 05/08.../2026Offer Due Date ...
State Government of Hawaii
Bid Due: 6/08/2026