| Location: | California |
|---|---|
| Posted: | Sep 27, 2024 |
| Due: | Oct 23, 2024 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include adding a second lane to the off-ramp of Bellam Boulevard from US 101 beyond the gore point and continue the lane beyond the Interstate 580 (I-580) off-ramp to the Bellam Boulevard intersection. The I-580 eastbound (EB) on-ramp would be widened in order to receive the shifted through lane. Additional improvements generally include concrete barrier, traffic signal modification, storm drain improvements, pavement markings/striping and a new retaining wall.
See NORTHBOUND US 101/BELLAM BOULEVARD OFF-RAMP IMPROVEMENT PROJECT for full details.

With GovernmentContracts, you can:
...project will include the installation of a new 24-inch HDPE storm drain pipe ...
Napa County
Bid Due: 7/07/2026
...Avenues, West of Grantland Avenue, Fresno, CA consists of Storm Drain Facilities and ...
Fresno Metropolitan Flood Control District
Bid Due: 6/17/2026
...from Devlin Road to State Route-29. Work also includes storm drain system installation ...
City of American Canyon
Bid Due: 7/09/2026
...utilities in area of work and design relocation as necessary (i.e.: storm drain ...
City of Rohnert Park
Bid Due: 6/26/2026