Finance | Procurement Division
8800 Courthouse Road | Spotsylvania, VA 22553
Phone: 540-507-7503
Addendum No. 3
IFB No. 26-19-TS
Livingston Landfill Sanitary Cell IID Alpha Construction
January 20, 2026
This Addendum is issued in accordance with the IFB Terms & Conditions and is intended to provide
additional information and clarification to Respondents.
This Addendum consists of one (1) item which is listed below and are an integral part of the IFB to which
it is attached and is incorporated therein and made part thereof by this reference.
Item 1 – Questions
1. Does a new temporary anchor trench need to be installed on the southern most limits of cell
1 cap removal shown on sheet 4? This footage is approximately 227 LF.
ANSWER: No, the remaining cap is to be dressed per Note 1 on Detail 3, Drawing 17.
2. Profile sheet 8 calls for 2 EA air release valves to be installed on the forcemain, however no
detail has been provided. Can a detail or specification be provided for these fixtures?
ANSWER: Per Note 4 of Detail 1 on Drawing 8, provide a Bermad Series C50 (C50-P is
adequate) air release valve. Use a flanged tee to connect the valve to the force main. The
valve is to be set below grade in a utility box (Note 5).
3. Is there a manufacturer or model number for the two 3” PVC automatic air release valves
that are shown on detail 4 sheet 12?
ANSWER: To be consistent with the slope riser pump stations at existing cells (e.g., Cells
IIA), install 4” air release valves (Bermad Series C50) on the top of the vertical force main
pipe with a flanged tee (at location 10 on Detail 2, Drawing 12).
Respondents shall acknowledge receipt of this Addendum with Bid submission.
Vendor Name
Date
Signature
Title
Addendum 3
IFB 26-19-TS | Page 1 of 1