N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter
| Location: |
Georgia |
| Posted: |
Oct 22, 2026 |
| Due: |
Oct 26, 2026 |
| Agency: |
VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- N - Installation of Equipment
|
| Solicitation No: |
36C24727Q0050 |
| Publication URL: |
To access bid details, please log in. |
N045--Boiler 3 Oxygen Analyzer and Steam Flow Meter
Active
Contract Opportunity
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
247-NETWORK CONTRACT OFFICE 7 (36C247)
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
-
Updated Published Date: Oct 22, 2026 11:00 am CDT
-
Original Published Date: Oct 15, 2026 10:46 am CDT
-
Updated Date Offers Due: Oct 26, 2026 10:00 am CDT
-
Original Date Offers Due: Oct 26, 2026 10:00 am CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Jan 24, 2027
-
Original Inactive Date:
Jan 24, 2027
-
Initiative:
Classification
Description View Changes
Questions and Answers
36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses
Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only.
Burner 3 boiler/burner controls where applicable and local display.
Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only?
Oxygen analyzer must send signals/information to combustion controls to control trim.
What is the material of construction for the stack? Is it single or double wall?
Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S.
Current operating pressure and temperature of the system for boiler #3?
Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit.
What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)?
4-20 mA analog.
Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)?
Steam flow meter is wired into local CB Hawk analog terminal block.
Please provide nameplates for the existing oxygen analyzer and steam flow meter.
Oxygen analyzer nameplate:
Steam flow meter nameplate:
Attachments/Links
Contact Information
Contracting Office Address
-
ONE FREEDOM WAY
-
AUGUSTA , GA 30904
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Follow F-15E Flat Panel Multipurpose Display (FPMPD) Active Contract Opportunity Notice ID... Description ...
DEPT OF DEFENSE
Bid Due: 11/12/2026
...Follow Presolicitation Notice: Repair of the F-15 Digital Mapping System (DMS) Advanced Display... ...
DEPT OF DEFENSE
Bid Due: 11/05/2026
...and Displays BuyerContact: Maria Thompson maria.thompson@glynncounty-ga.gov (912) 554-7127...
State Government of Georgia
Bid Due: 11/12/2026
..., preparation of displays for public meetings, surveys and mapping, preliminary construction plans, ...
State Government of Georgia
Bid Due: 12/01/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.