Date Issued: 12/17/2025
Request for Proposal:
Casper College New
Buildings Level I
Study
Request for Qualifications
Number: #CC598-24
PROPOSAL DUE DATE AND TIME:
January 16, 2025 – 2:00 P.M. Mountain Time
Request for Proposal Opening:
January 16, 2025 – 2:00 P.M. Mountain Time
Question Deadline:
January 9, 2025 – 2:00 P.M. Mountain Time
Non-Mandatory Site Visit:
January 7, 2025 – 3:15 P.M. Mountain Time GW 312
PROCUREMENT REPRESENTATIVE:
Shane Pulliam
E-MAIL ADDRESS: shane.pulliam@caspercollege.edu
TELEPHONE NO: (307) 268-2633
1
TABLE OF CONTENTS
SECTION ONE: DEFINITIONS AND TERMINOLOGY
Date Issued: 12/17/2025
SECTION TWO: SPECIFICATIONS AND SCOPE OF WORK
SECTION THREE: EVALUATION METHODOLOGY
1.
Overview
2.
Evaluation Criteria
SECTION FOUR: INSTRUCTIONS TO BIDDERS AND PROPOSAL REQUIREMENTS
1. General Conditions
2. Preparation of Proposals
3. Pre-Proposal Meeting and Job Walk
4. Submission / Modifications / Withdrawals / Late proposals
5. Questions About RFQ / Addendums
6. Bid Opening
7. Award and Contract Information
8. Required Documentation for Awarded Proposal
9. Qualification of Bidder
10. Laws and Regulations
11. Environment, Health, and Safety
SECTION FIVE: SCHEDULE OF ACTIVITIES
2
SECTION 1: Definitions and Terminology
Date Issued: 12/17/2025
Wherever used in this request for qualifications (RFQ) these or other related procurement
documents, the following terms have meanings indicated which are applicable to both the
singular and plural thereof. The terms can be used interchangeably.
Addendum: Written or graphic instruments issued prior to the opening of bids that clarify,
correct, or change the bid documents or the related procurement documents.
Bidder / Firm: The company/vendor that is submitting a statement of qualifications (SOQ).
Contract: An agreement between Casper College and the bidder that will include a written
contract, RFQ, addendums (if any), purchase order(s), purchase order terms and conditions,
as well as the bidder’s response to the RFQ.
Contractor / Architect: The Company awarded a contract or PO for this Bid.
Evaluation Committee / Stakeholders: Casper College hired contractors or employees
that have an interest in the project.
Purchase Order / PO: A contractual agreement with a firm for goods or services that
specifies payment terms, delivery dates, item identification, quantities, freight terms, and
other obligations and conditions.
Statement of Qualifications (SOQ) / Proposal / REQUEST FOR QUALIFICATIONS
(RFQ): This formal publicly released document outlining a need and inviting businesses to
submit responses to fulfill our request.
Schedule of Values: A start to finish list of work items on a project including the cost
associated with those work items that the bidders will want to be paid on throughout the
project.
Specifications / Scope of Work: Those portions of this proposal consisting of written or
graphic technical descriptions of materials, equipment, construction systems, standards,
workmanship, goods, services, and administrative details applicable.
SECTION 2: SPECIFICATIONS AND SCOPE OF WORK
1. Purpose
1.1. Casper College is accepting Statements of Qualifications (SOQs) from licensed
architects and planners for Level 1 planning, development, and design of two (2) new
buildings on the Casper College Campus. The intended structures will include a new
School of Health Sciences and Industry Building that have been identified in our 2024
Campus Master Plan Refresh.
1.2. This project will consider planning and programming under the titles of
reconnaissance and feasibility statutorily required for State funded projects. Casper
College through it 2024 Campus Master Plan Refresh has identified the need for a new
School of Health Sciences and a new School of Business and Industry industrial
building. Casper College currently faces a space deficiency that hinders the growth of
academic programs, research, and don’t maximize educational relationships. The
existing facilities are either outdated or inadequate to meet the increasing enrollment
demands and evolving technology. The new construction aims to alleviate these issues
by providing modern infrastructure to support innovative teaching, research, and
interdisciplinary approach to education.
3
Date Issued: 12/17/2025
1.3. Casper Colleges 2024 Campus Master Plan Refresh is available at this URL:
https://www.caspercollege.edu/wp-content/uploads/2024/05/2024-Casper-College-
Master-Plan-Refresh-FINAL_Completed.pdf
1.4. The successful bidder will be responsible for delivering Casper College a
completed Level 1 Reconnaissance Study outline in Wyoming State Statue 9-2-
108 (i).
1.5. Casper College also requires the completion of Level 1 Reconnaissance Study
for each building. In addition, each building will need an individual conceptual
design work, resulting in two separate studies and corresponding design efforts.
1.6. The conceptual design will need to include estimated overall cost, square
footage, and space allocations.
1.7. This is not a Request for Proposals. Casper College is not obligated by this RFQ to
award any contracts. Responding proposers may be invited to submit proposals
pending the outcome of this request of qualifications.
1.8. Project Overview: This project will consist of:
• Level 1 reconnaissance studies shall, to the extent possible:
• Describe the project.
• Identify the need for the project
• Assess the status of proposed site ownerships, including existing conflicts,
and recommendations for resolution of the conflicts and recommendations
for resolution for the conflicts and any other potential obstacles. This needs
to be done in cooperation with appropriate local, county, and state agencies.
• Assess and describe local, state, and federal permits required for
construction.
• Assess environmental considerations and constraints.
• Identify legal constraints to development.
• Identify alternate sources of space to purchase and/or lease.
• Summarize public testimony received at meetings held by the commission
in the county of the proposed construction.
• Contain the commission’s recommendation to the legislature whether to
terminate further consideration of the proposed project or to continue the
project at its current level of study, or to proceed with further activity.
1.9. Possibility to proceed with the Level II Feasibility Studies.
1.10. Qualifications
• The following are the mandatory qualifications and licenses for this project:
• Professional Licensed and insured architect.
• The managing professional/project managers to be licensed or registered
in Wyoming prior the execution of a contract. Respondents should provide
assurance that each managing team member will be able to expediently
secure Wyoming license/registration.
4
Date Issued: 12/17/2025
• A work portfolio and reference that contains a minimum of three (3) similar
projects with in the last five years.
2. Proposal Format
2.1. The Statement of Qualification shall be no more than thirty (30) pages. Cover page,
table of contents, and divider tabs/pages will not count toward the total number of
pages.
2.2. The Statement of Qualifications submittal shall be tabulated and include the following
information, forms, and supporting information.
• Tab 1:
• General: Table of Contents and Executive Summary
• Table of Contents: The table of contents should include all items listed in each
section.
• Executive Summary: The executive summary will condense and highlight the
contents of the scope in such way as to provide the College with a broad
understanding of the proposer’s qualifications and approach to meeting the
requirements of the RFQ.
• Provide a statement stating that your firm meets the minimum qualifications
requirement for this project.
• Provide a statement indicating your firm’s ability to commit personnel and
resources to the project.
• Single Point of Contact: The proposer should identify a single point of contact
for all contract management activities and approvals. Also include the name,
firm address, title and email address of the individual with signature authority.
The proposer’s Project Manager’s name and resume should be submitted
with the proposal. The successful proposal should not change the Project
manager without written Agency approval.
• Tab 2:
• Please state the qualifications of the Firm and individuals involved with this
project. Company information, key personnel information, past work on similar
projects. Firm Qualifications submittals must include a listed summary of
experience and certifications demonstrating qualifications.
• The proposer should include a company summary including the company history,
geographic location, office location(s), company size, and the statement of
technical areas of expertise.
• Please include an organization chart should be included with all proposed
personnel, including the supervisor level, functional responsibilities, key
personnel, and other staff members who will be involved in the project.
• Tab 3:
• Please include a list of successfully completed similar projects for which your firm
has preformed in the last five (5) years. We are asking that firms have completed
a minimum of three (3) similar project in this time frame. Key information that is
needed on these projects is an overview of the project, project location, client
information, clients contact information (if you can provide more than one contact
for each project please do), start and end date of the project, construction costs,
and size of the building(s).
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.