| Location: | California |
|---|---|
| Posted: | Oct 1, 2024 |
| Due: | Nov 6, 2024 |
| Agency: | City of Lake Forest |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: BAKE PARKWAY AND IRVINE BLVD./TRABUCO RD. STREET IMPROVEMENTS
Addenda: 0
Release Date: 10/1/2024
Due Date: 11/6/2024
The project consists of converting the northbound dedicated right-turn lane on Trabuco into a 4th through/right lane; restriping the southbound #3 through lane on Irvine Boulevard into a through/right lane; adding a second eastbound left-turn lane on Bake Parkway; restoring the second left-turn lane on westbound Bake; and providing a dedicated right-turn lane on eastbound Bake.
Utility coordination between SCE, Cox Communications and TPX will be required during the project. Cox and TPX have existing facilities on the capped SCE poles. Cox & TPX will require a window during the project to relocate their facilities and SCE will need to remove the capped poles.

With GovernmentContracts, you can:
...Basic Information Title SB Minor B 05A3048 - Relocate Controller Assembly in Santa ...
State Government of California
Bid Due: 10/05/2026
...base. Contractor shall relocate Impacted electrical receptacles as directed by City. All holes ...
City of Anaheim
Bid Due: 10/15/2026
...specialist services to trap and relocate problem avian predators for the management of ...
State Government of California
Bid Due: 9/30/2026