WWTF Biosolids Modernization (CIP 21-17)

Location: Washington
Posted: Nov 6, 2025
Due: Nov 20, 2025
Agency: Sammamish Plateau Water
Type of Government: State & Local
Category:
  • D - Automatic Data Processing and Telecommunication Services
Solicitation No: CIP 21-17
Publication URL: To access bid details, please log in.
Project: WWTF Biosolids Modernization (CIP 21-17)
Ref. #: CIP 21-17
Department: City of Sumner
Type: RFB
Status:
Open
Open Date: Oct 8th 2025, 12:00 AM PDT
Intent to Bid Due Date: Nov 20th 2025, 1:00 PM PST
Questions Due Date: Nov 6th 2025, 12:00 PM PST
Contact Information: Courtney Littrell, bids@sumnerwa.gov
Close Date: Nov 20th 2025, 1:00 PM PST

Project Description: This project will construct upgrades to the solids handling and solids treatment processes at the existing City of Sumner Wastewater Treatment Plant. These improvements will include construction of an expansion to the existing Solids Handling Building, to include the installation of the new indirect biosolids dryer, thermal fluid heaters, and all associated equipment encompassed in the biosolids dryer scope of supply. The Contractor shall be assigned the portions of the executed Contract titled Biosolids Modernization Project Biosolids Drying Equipment Procurement, for the following items as Specified in the Contract: Equipment Supply, Construction Services, and Post Construction Services. The executed Biosolids Drying Equipment Procurement Contract is attached to the City of Sumner Wastewater Treatment Plant Biosolids Modernization Contract Documents as Part IX. The project will also include construction of a temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures and processes will include: replacement of the existing thickened primary sludge pumps in the existing Scum Pump Building, demolition of the existing dissolved air floatation thickener and associated equipment in Equipment Building 2 and the installation of a new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of the existing digested sludge pumps, replacement of the existing thickening and dewatering polymer systems and replacement of the existing air gap system in the existing Solids Handling Building. The existing dewatered sludge conveyance system will also be reconfigured including rehabilitation of the existing dewatered sludge storage hopper, modifications to existing conveyors (both temporary and permanent) and installation of new conveyors. Other project elements include the demolition of the existing waste gas burner and the installation of a new digester gas treatment system to include a hydrogen sulfide and moisture removal and digester gas compression, as well as the installation of a new enclosed waste gas flare. In addition, the existing submersible pumps in Plant Drain Pump Station No. 1 will be replaced and the walls of the existing centrate storage tank will be raised six feet. The internal recycle pumps and anoxic zone mixers in Aeration Basins 1 and 2 and the effluent UV disinfection system will also be replaced. The project will also include installation of new and modifications to existing electrical power distribution and control equipment to support the new improvements, including the installation of a new standby generator with subbase fuel tank in a sound attenuating enclosure. Finally, the project will include construction of a new hammerhead on State Street just outside the entrance to the plant and new security fencing and access gates.
Please contact Courtney Littrell, Assistant Engineering Manager, at bids@sumnerwa.gov or (253) 299-5710.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Conveyors, Spray Dryer Absorbers, Wheelabrator Fabric Filter Systems, and Overhead Crane Repair. Additional...

City of Spokane

Bid Due: 7/13/2026

...Conveyors, Spray Dryer Absorbers, Wheelabrator Fabric Filter Systems, and Overhead Crane Repair. Additional...

City of Spokane

Bid Due: 7/13/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.