| Location: | New Mexico |
|---|---|
| Posted: | Jul 28, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000012 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.
PROJECT NUMBER: NM FS 220(1)
PROJECT NAME: Romero Creek Bridge
PROJECT DESCRIPTION: This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft.
The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2” to 10”). The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220.
SCOPE OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing single-span bridge’s overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
It is anticipated this project will be advertised in Summer 2025 and be under construction in the Fall of 2025. The project has an estimated completion date of Fall 2026.
Due to weather, no onsite work is to occur from early March to early May.
ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.
| Aug 15, 2025 | [Solicitation (Original)] NM FS 220(1), Romero Creek Bridge |
| Aug 18, 2025 | [Solicitation (Updated)] NM FS 220(1), Romero Creek Bridge |
| Aug 19, 2025 | [Solicitation (Updated)] NM FS 220(1), Romero Creek Bridge |
| Sep 8, 2025 | [Solicitation (Updated)] NM FS 220(1), Romero Creek Bridge |
| Sep 16, 2025 | [Solicitation (Updated)] NM FS 220(1), Romero Creek Bridge |
| Oct 31, 2025 | [Solicitation (Updated)] NM FS 220(1), Romero Creek Bridge |

With GovernmentContracts, you can:
...INFIRMARIES NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/22/2026