| Location: | South Carolina |
|---|---|
| Posted: | Nov 5, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-CMG-B-020 |
| Publication URL: | To access bid details, please log in. |
Scope of work includes but is not limited to: prep, patch, and paint interior walls and interior hollow metal doors and frames in the entire school. Existing room and wayfinding signage to be removed, and new room and wayfinding signage to be installed. Existing base to be ripped off and replaced by the CCSD flooring contractor. PREBID 11/12/25 @ 11 a.m. at 4399 Corporate Rd., Bldg. 300, N. Charleston, SC 29405.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: $1,235,000 to $1,305,000 Agency Project Coordinator... and support ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project...: Improvements include ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...and hardware. Documents May Be Obtained From: Scherrie Cogdill, Director of Design and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29104 Project Delivery Method: Design-Build Construction Cost Range: $96,000 Agency Project... with applicable ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026