| Location: | California |
|---|---|
| Posted: | Aug 17, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | Carmichael Water District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
On-Call Asphalt Construction Services
|
| Category: | On-Call Services |
| Status: | Open |
| Bid Recipient: | gregn@carmichaelwd.org |
|
INVITATION TO BID
for
ON-CALL ASPHALT CONSTRUCTION SERVICES
BIDS DUE: 2:00 p.m., Wednesday, September 9, 2026 at
7837 Fair Oaks Boulevard
Carmichael, CA 95608
PUBLIC WORKS BID AND CONTRACT DOCUMENTS
TABLE OF CONTENTS
1 BIDDING REQUIREMENTS ......................................................................................... 1-1
1.1 INVITATION TO BID ........................................................................................ 1-1
1.2 BID ....................................................................................................................... 1-3
1.3 BID SCHEDULE ................................................................................................. 1-5
1.4 DESIGNATION OF SUBCONTRACTORS .................................................... 1-10
1.5 THIS SECTION INTENTIONALLY OMITTED ............................................. 1-11
1.6 EXPERIENCE QUALIFICATIONS ................................................................. 1-11
1.7 NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND
SUBMITTED WITH BID (PUBLIC CONTRACT CODE SECTION 7106) .. 1-13
1.8 ACKNOWLEDGMENT OF INSURANCE REQUIREMENTS ...................... 1-14
1.9 THIS SECTION INTENTIONALLY OMITTED ............................................. 1-15
2 CONTRACT FORMS ..................................................................................................... 2-1
2.1 CONTRACT ........................................................................................................ 2-1
2.2 THIS SECTION INTENTIONALLY OMITTED ............................................... 2-3
2.3 THIS SECTION INTENTIONALLY OMITTED ............................................... 2-3
2.4 CONTRACTOR'S WORKERS' COMPENSATION CERTIFICATE (LABOR
CODE SECTION 1861) ...................................................................................... 2-4
3 ABBREVIATIONS AND DEFINITIONS ...................................................................... 3-1
3.1 ABBREVIATIONS ............................................................................................. 3-1
3.2 DEFINITIONS ..................................................................................................... 3-2
4 INSTRUCTIONS TO BIDDERS .................................................................................... 4-1
4.1 INTRODUCTION ............................................................................................... 4-1
4.2 CONTRACT DOCUMENTS/PLANS ................................................................ 4-1
4.3 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-1
4.4 FORM OF BID AND SIGNATURE ................................................................... 4-1
4.5 SUBMISSION OF BIDS ..................................................................................... 4-1
4.6 PREPARATION OF THE BID ........................................................................... 4-2
4.7 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-2
4.8 LIST OF SUBCONTRACTORS; SUBCONTRACTING LIMITS .................... 4-2
4.9 INTERPRETATION OF CONTRACT DOCUMENTS ..................................... 4-3
Carmichael Water District i
On-Call Asphalt Construction Services For Bid
August 14, 2026
4.10 MODIFICATION OF BIDS ................................................................................ 4-3
4.11 WITHDRAWAL AND RETURN OF BIDS ....................................................... 4-3
4.12 RELIEF OF BIDDERS AFTER BID OPEN ....................................................... 4-3
4.13 DISCREPANCIES ............................................................................................... 4-4
4.14 SERVICING AND MAINTENANCE ................................................................ 4-4
4.15 DISQUALIFICATION OF BIDDERS ................................................................ 4-4
4.16 AWARD OF CONTRACT .................................................................................. 4-5
4.17 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-5
4.18 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-5
4.19 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-5
4.20 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-5
4.21 TIME OF COMPLETION ................................................................................... 4-5
4.22 LICENSING REQUIREMENTS FOR CONTRACTORS ................................. 4-5
4.23 PREVAILING WAGES ...................................................................................... 4-5
4.24 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-6
4.25 INELIGIBLE CONTRACTORS AND SUBCONTRACTORS ......................... 4-6
4.26 AUDIT OF BID DOCUMENTS ......................................................................... 4-6
4.27 THIS SECTION INTENTIONALLY OMITTED ............................................... 4-6
5 GENERAL CONDITIONS ............................................................................................. 5-1
5.1 INTENT OF CONTRACT DOCUMENTS/MEANS AND METHODS ........... 5-1
5.2 CONTRACTOR'S UNDERSTANDING ............................................................ 5-1
5.3 CHANGES IN THE WORK ............................................................................... 5-2
5.4 CLAIMS AND RESOLUTION OF DISPUTES ................................................. 5-5
5.5 GUARANTEE ................................................................................................... 5-10
5.6 AUTHORITY OF THE ENGINEER ................................................................ 5-11
5.7 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-12
5.8 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-12
5.9 PERMITS AND REGULATIONS .................................................................... 5-12
5.10 CONFORMITY WITH CONTRACT DOCUMENTS ..................................... 5-12
5.11 COORDINATION & INTERPRETATION OF CONTRACT DOCUMENTS 5-12
5.12 SUBCONTRACTS ............................................................................................ 5-13
5.13 COOPERATION OF CONTRACTORS ........................................................... 5-13
Carmichael Water District ii
On-Call Asphalt Construction Services For Bid
August 14, 2026
5.14 SUPERINTENDENCE ...................................................................................... 5-14
5.15 INSPECTION OF WORK ................................................................................. 5-14
5.16 TESTS ................................................................................................................ 5-16
5.17 REMOVAL OF REJECTED/UNAUTHORIZED WORK AND MATERIALS .. 5-
16
5.18 DEDUCTIONS FOR UNCORRECTED WORK ............................................. 5-17
5.19 EQUIPMENT AND PLANTS ........................................................................... 5-17
5.20 CHARACTER OF WORKER ........................................................................... 5-17
5.21 SEPARATE CONTRACTS .............................................................................. 5-17
5.22 MATERIALS ..................................................................................................... 5-18
5.23 STORAGE OF MATERIALS; STORAGE AREAS ........................................ 5-18
5.24 TRADE NAMES AND ALTERNATIVES....................................................... 5-18
5.25 CERTIFICATES OF COMPLIANCE ............................................................... 5-19
5.26 ASSIGNMENT .................................................................................................. 5-19
5.27 DISTRICT ENTRY ON WORK SITE; RIGHT TO OPERATE
UNSATISFACTORY EQUIPMENT OR FACILITIES ................................... 5-20
5.28 LANDS FOR WORK; RIGHTS OF WAY; CONSTRUCTION ROADS;
TEMPORARY UTILITY SERVICES .............................................................. 5-20
5.29 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-21
5.30 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-21
5.31 SUSPENSION OF WORK ................................................................................ 5-21
5.32 TERMINATION FOR DEFAULT; DAMAGES FOR DELAY; TIMELY
EXTENSION ..................................................................................................... 5-22
5.33 RIGHTS OF DISTRICT UPON TERMINATION ........................................... 5-24
5.34 THIS SECTION INTENTIONALLY OMITTED ............................................. 5-25
5.35 CLEAN UP ........................................................................................................ 5-25
5.36 COMPLIANCE WITH LAWS; PERMITS; TAXES ........................................ 5-25
5.37 PREVAILING WAGE PENALTIES; WAGE CLAIMS PROHIBITED ......... 5-26
5.38 LABOR DISCRIMINATION ............................................................................ 5-26
5.39 EIGHT HOUR DAY LIMITATION; CERTIFIED PAYROLL REPORTS .... 5-27
5.40 EMPLOYMENT OF APPRENTICES .............................................................. 5-28
5.41 WATER POLLUTION ...................................................................................... 5-28
5.42 PATENTS .......................................................................................................... 5-28
Carmichael Water District iii
On-Call Asphalt Construction Services For Bid
August 14, 2026
5.43 PUBLIC CONVENIENCE ................................................................................ 5-28
5.44 UNDERGROUND UTILITIES ......................................................................... 5-29
5.45 SAFETY AND TRENCHING ........................................................................... 5-29
5.46 PROTECTION OF PERSON AND PROPERTY ............................................. 5-32
5.47 HAZARDOUS MATERIALS; HAZARD COMMUNICATION .................... 5-33
5.48 RESPONSIBILITY FOR REPAIR OF FACILITIES ....................................... 5-34
5.49 DISTRICT'S REPAIR ....................................................................................... 5-34
5.50 CONTRACTOR'S LICENSE NOTICE ............................................................ 5-34
5.51 PUBLIC WORKS CONTRACTOR REGISTRATION .................................... 5-34
5.52 INSURANCE ..................................................................................................... 5-34
5.53 INDEMNITY AND DEFENSE OBLIGATION ............................................... 5-37
5.54 PROTECTION OF WORK ............................................................................... 5-39
5.55 ACCIDENTS ..................................................................................................... 5-40
5.56 NO PERSONAL LIABILITY ........................................................................... 5-41
5.57 MEASUREMENT OF QUANTITIES .............................................................. 5-41
5.58 SCOPE OF PAYMENT ..................................................................................... 5-41
5.59 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-42
5.60 INVOICES ......................................................................................................... 5-42
5.61 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-42
5.62 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-42
5.63 THIS SECTION INTENTIONALLY OMITTED. ............................................ 5-42
5.64 RIGHT TO WITHHOLD PAYMENTS ............................................................ 5-42
5.65 WAIVER OF INTEREST.................................................................................. 5-43
5.66 SATISFACTION OF CLAIMS AND LIENS ................................................... 5-43
5.67 ASSIGNMENT OF ANTI-TRUST CLAIMS ................................................... 5-43
5.68 AVAILABILITY AND AUDIT OF INFORMATION ..................................... 5-44
5.69 INTEGRATION ................................................................................................ 5-44
5.70 COUNTERPARTS AND ELECTRONIC SIGNATURES ............................... 5-44
5.71 WAIVER............................................................................................................ 5-45
5.72 REMEDIES NOT EXCLUSIVE ....................................................................... 5-45
5.73 SEVERABILITY ............................................................................................... 5-45
5.74 GOVERNING LAW AND VENUE ................................................................. 5-45
Carmichael Water District iv
On-Call Asphalt Construction Services For Bid
August 14, 2026
5.75 NOTICES ........................................................................................................... 5-45
5.10 CONFORMITY OF CONTRACT DOCUMENTS ........................................................ 5-2
5.29 PROGRESS SCHEDULE ............................................................................................... 5-2
5.30 COMMENCEMENT AND PROGRESS OF THE WORK ............................................ 5-2
Carmichael Water District v
On-Call Asphalt Construction Services For Bid
August 14, 2026
1 BIDDING REQUIREMENTS
1.1 INVITATION TO BID
Sealed proposals will be received at the office of the Carmichael Water District, located at
Carmichael Water District, 7837 Fair Oaks Boulevard, Carmichael, CA 95608, until 2:00 P.M.
local time on Wednesday, September 9, 2026, or such later date as may be set by addendum, and
then will be publicly opened and read for the construction of the following public works project:
On-Call Asphalt Construction Services: Provide Asphalt construction services for
Carmichael Water District (District) water line construction projects. The District
repairs, maintains, and replaces water distribution lines on a regular basis that often
require asphalt construction when location of work is on public roads. The District
will contact the contractor at any time throughout the duration of the contract, as
the need for asphalt construction services arise.
The contract documents for the Project, including the public works construction contract,
instructions to bidders, bid forms, and plans and specifications, may be examined at the District
office, with prior notice to the District's representative, located at 7837 Fair Oaks Blvd,
Carmichael, CA 95608. One copy of the contract documents must be purchased from ARC
Document Solutions in order to be an eligible bidder. (https;//customer.e-
arc.com/arcEOC/ARCPlanRoom.aspx). Potential Bidders may also obtain additional copies of
contract documents from the District website (www.carmichaelwd.org) at no charge. Bidders must
comply with the 'Instructions to Bidders' in the contract documents.
The successful bidder must possess the following classification or type of contractor's
license issued by the Contractors State License Board: Class A.
To be qualified to bid on this Project, bidders must be registered and qualified to perform
public work with the Department of Industrial Relations pursuant section 1725.5 of the Labor
Code. All subcontractors listed in a qualified bidder's bid as performing any portion of the work
also must be registered and qualified with the Department of Industrial Relations.
The attention of bidders is directed to the requirements and conditions of employment to
be observed and prevailing wage rates to be paid to all workers employed under the Contract in
accordance with Labor Code sections 1770 and following. Copies of the prevailing rate of per
diem wages are on file at the District's office, and will be made available to any interested party
on request. In accordance with Labor Code section 1771.4(a)(1), this project is subject to
compliance monitoring and enforcement by the Department of Industrial Relations.
The District reserves the right to reject all bids. Any bid not conforming to the intent and
purpose of the Contract Documents may be rejected. The District may extend the time to award
the Contract.
Carmichael Water District 1-1
On-Call Asphalt Construction Services For Bid
August 14, 2026
Dated: Carmichael Water District
By:
Kenneth V. Payne
Interim General Manager
Carmichael Water District 1-2
On-Call Asphalt Construction Services For Bid
August 14, 2026
1.2 BID
TO: Carmichael Water District, 7837 Fair Oaks Boulevard, Carmichael, CA 95608
The undersigned states and declares as follows:
That the Bidder has carefully examined the description of the proposed work; that the
Bidder has examined the Contract Documents entitled: On-Call Asphalt Construction Services;
the Addenda Numbers ___ to ___, if any; that the Bidder has read the accompanying Instructions
to Bidders; that the Bidder hereby proposes to begin work and complete the project in accordance
with the schedule and deadlines in the Contract Documents; that the Bidder hereby proposes to
furnish all labor, materials, tools, and equipment, and to perform all work required, complete in
place, in compliance with all terms and conditions and requirements of the Contract Documents;
and that the Bidder will take in full payment for the work the prices set forth in the accompanying
bid schedule.
BIDDER INFORMATION
Bidder Name:
Type of Business Entity and State of Incorporation (e.g., corporation, limited liability
company, partnership):
Contractor's License No.:
DIR Public Works Contractor Registration No.:
Expiration Date:
Type of license:
Name under which license is held:
Status of license:
The Bidder's authorized officer identified below hereby declares that the representations in
this Bid are true and correct and of my own personal knowledge, and that these representations are
made under penalty of perjury under the laws of the State of California.
Authorized Signature:
Printed Name:
Title:
Carmichael Water District 1-3
On-Call Asphalt Construction Services For Bid
August 14, 2026
Date:
Address:
Phone:
Fax:
Email:
Carmichael Water District 1-4
On-Call Asphalt Construction Services For Bid
August 14, 2026

With GovernmentContracts, you can:
...Department Contract # Contract # Buyer Esme Houtepen Description "No Parking" Signs Bid ...
City of Long Beach
Bid Due: 9/24/2026
...Department Contract # Contract # Buyer Esme Houtepen Description "No Parking" Signs Bid ...
City of Long Beach
Bid Due: 9/24/2026
...Basic Information Title PARKING LOT STEAM CLEANING SERVICES - IFB 26C830002 Agency Dept ...
State Government of California
Bid Due: 9/21/2026
...Basic Information Title Prequalification of Prospective Bidders for Parking Lot E8 Repairs Agency... ...
State Government of California
Bid Due: 10/05/2026