SL District, City of St. Louis, Removal & Replacement of Southwets & Columbia Bridges

Location: Missouri
Posted: Nov 6, 2026
Due: Nov 10, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW SL District, City of St. Louis, Removal & Replacement of Southwets & Columbia Bridges 10/7/26 11/10/26
Addendum SL District, City of St. Louis, Removal & Replacement of Southwets & Columbia Bridges Addendum 1 11/6/26 11/10/26

Attachment Preview

FEDERAL PROJECT NO. STP-9900(675)
CITY OF SAINT LOUIS
DEPARTMENT OF THE PRESIDENT, BOARD OF PUBLIC SERVICE
****************
ADDENDUM NO. 1
TO
PLANS AND SPECIFICATIONS
FOR
REMOVAL & REPLACEMENT OF
SOUTHWEST & COLUMBIA BRIDGES
ST. LOUIS, MISSOURI
DATE: 11/6/26
LETTING NUMBER: 8800
The following changes and additions shall be made in the plans,
specifications, and bid form. The cost thereof shall be included
in the proposals submitted by the bidders.
Receipt of this addendum must be acknowledged on Bid Express.
REVISIONS TO THE BID OPENING DATE
*
The bidding period is being extended. Bids must be submitted
prior to 1:45 PM on Tuesday, December 1, 2026.
*
The City will accept questions submitted through Bid Express
until 5:00 PM, Wednesday, November 18.
REVISIONS OT THE PLANS
*
Sheet C-300 & Sheet C-401 - There is a billboard located at
Sta 106+96 LT that is identified as "R" on Sheet C-401, and
is included in the Removal of Improvements quantities on the
B sheets. The billboard will be removed by others prior to
the start of construction, and at no cost to the Contactor.
*
Sheet C-1000 - Delete Lighting Note #2 in its entirety. Poles
and luminaires should be the MoDOT standard items shown in
the bid sheet.

*
Sheet C-401 - There are two separate structures located on
Parcel 6 (5134 Southwest Ave). The smaller structure is
identified on the plan sheet as "DND". By this Addendum, the
smaller structure is designated for demolition and removal.
Contractors shall include all costs associated with the
demolition of removal of both existing structures located on
Parcel 6 in their bid prices.
o Note: The smaller structure abuts the building currently
owned and occupied by Park Avenue Coffee (5105 Columbia
Ave). Care should be taken to protect the adjacent
building. Upon completion of the demolition and removal
of the smaller structure, the owner of the coffee shop
will retain a separate contractor to perform any
necessary repairs to the exposed wall of the adjoining
building. This work will be performed at no expense to
the City's contractor. However, the City's contractor
shall coordinate and schedule demolition activities with
the coffee shop owner and its contractor, as necessary,
to facilitate the timely completion of the wall repair
work. There will be no direct pay for any incidental
expenses related to the coordination or scheduling of
this work, the costs of which should be incorporated
into the line item for the demolition.
REVISIONS OT THE PROJECT SPECIFICATIONS
*
Bridge JSP I - Union Pacific Railroad (UPRR) Requirements
o REPLACE Section 2.5 Flagmen in its entirety with the
following:

Flagmen shall be required any time either
contractor personnel or equipment are within 25' of
Union Pacific tracks. The Contractor shall be
solely responsible for arranging, scheduling,
coordinating, and paying for all railroad flagging
services required for the performance of the Work.
All railroad flagging personnel shall be obtained
from Union Pacific Railroad's approved list of 3rd
party flagging service providers.
o ADD Section 3.2 - The cost for flagmen required in
conjunction with this special provision shall be
included in the item "6189901 - UPRR Flagmen", measured
via contract lump sum.
o ADD Section 3.3 - The cost for all Contractor insurance
and permits required in conjunction with this special
provision shall be included in item "6189901A - UPRR
Insurance and Permits" measured via contract lump sum
price.
o ADD Section 3.4 - UPRR will invoice the Contractor for
work completed, project management, construction

submittals, construction management, onsite meeting and
travel, and final inspection. The item "6189902 - UPRR
Fees" will be measured per each and set at the contract
unit price of $1.00 and shall serve solely as the
mechanism for reimbursing the Contractor for invoices
from UPRR to the Contractor. This item shall be
administered as a pass-through cost reimbursement with
no markup permitted. Should the final invoice cost from
UPRR change from the let price, a change-order will be
issued to adjust the quantity to match the final invoice
amount.
REVISIONS OT THE BID FORM
*
ADD - Line Item "6189901 - UPRR Flagmen" - 1 Lump Sum
*
ADD - Line Item "6189901A - UPRR Insurance and Permits" - 1
Lump Sum
*
ADD - Line Item 6189902 - UPRR Fees" - 250,000 Each @
$1.00/EA
END OF ADDENDUM NO. 1
Attachments:
Pre-bid sign in sheet (1 page)
Pre-bid meeting minutes (3 pages)

Pre-Bid Meeting Minutes, 10/20/26
Removal & Replacement of Southwest/Columbia Bridges
Over UPRR
Federal Project # STP-9900(675)
* The project will remove the two adjacent Southwest Ave and Columbia Ave bridges that cross
over the Union Pacific Railroad track, and will construct a single structure spanning both
features.
* Bids are due by Tuesday, November 10, 2026, at 1:45 pm. Bids must be submitted electronically
through Bid Express. The City will not accept paper bids, and any paper bid received will be
considered non-responsive and rejected. The link for the City's home page on Bid Express is
provided in the project specifications. Contractors will need to create a vender account and
must have a Digital ID. There is no longer any charge from Bid Express to contractors for bidding
on this project.
* Bids will be publicly read at the start of the Board of Public Service weekly Board meeting. The
zoom link for the Board meeting is posted in the Bid Express, and results will be posted on Bid
Express shortly after bid opening.
* Contractors must have a completed Contractor's questionnaire on file with the Missouri
Highway & Transportation Commission at least 7 days prior to the bid opening date.
* Bidders must submit a bid deposit equal to 5% of the total bid. Bid deposits can either be
submitted electronically on Bid Express, or delivered directly to Helen Bryant in Room 301 of
City Hall. If not submitted electronically, the bid deposit must be received before the time of the
bid opening, and a scanned copy of the bid deposit must be uploaded to Bid Express.
* There are several affidavits that are due at the time of bidding and must be uploaded to Bid
Express to be considered a responsive bid. Those affidavits are all provided in the attachments
section of Bid Express.
* This contractor will have 240 working days to complete the project. Notice to Proceed is
anticipated to be issued around February/March 2027. Liquidated damages have been set at
$4,025.00/day.
* This contract requires that all onsite workers be paid prevailing wages. All workers also must
have completed the OSHA 10 hours safety training course.
* Contractors are required to be properly licensed to do business in the City of St. Louis through
the License Collector, and current on payment of City taxes. Contractors who do not meet these
requirements are eligible to bid on the project, and will have 45 days after the bid opening date
to address any issues with tax and license before their bid will be deemed unresponsive and
rejected.
* There is a DBE goal for this contract and DBE paperwork must be submitted for the bid to be
considered a responsive/responsible bid, however the DBE goal is 0%. The DBE submittal
package is due by 4:00 pm on the Friday following the bid opening, and can either be emailed or
hand delivered to Helen Bryant.

* This project does not have OJT goals.
* Questions regarding the plans and specifications will be received up through the end of business
on 11/4/26. Questions should be submitted directly to Bid Express and will be answered on Bid
Express.
* Contractors must acknowledge receiving all addendum issued when submitting your bid. Bid
Express will also require the contractor to acknowledge having read through any Q&A posted to
Bid Express when submitting the bid.
* The contractor will be responsible for obtaining all necessary permits from both the City and
MoDOT.
* This project is subject to the Buy America law, which will be strictly enforced on all iron, steel,
and steel coating products.
* Saturday work will be allowed on this project with advanced approval from the Board of Public
Service. Sunday work is typically not allowed on BPS projects except in the case of emergencies
and with BPS approval. The City recognizes that railroad coordination for this project may
require more work to be performed on weekends than a usual project, and will be amendable
provided advance notification is given.
* The project has several TCEs with restrictions.
The TCE for the drive approach to Parcel 4 (5201 Southwest Ave, Favazza's) is limited to
o
the time it takes to remove/replace the entrance. This area cannot be used for storage
or staging.
The TCE for the drive approach at Parcel 9 (5137 Southwest Ave, Kop-Coat) is limited to
o
the time it takes to remove/replace the entrance. This area cannot be used for storage
or staging.
The TCE near the train tracks at Parcel 9 was acquired to provide contractors an area
o
near track level for storage. After the TCE was purchased, MoDNR advised that the
address is listed on the E-START map due to ground contamination. Contractors are still
permitted to use this area for staging/storage, but absolutely no ground disturbance or
excavation is allowed at this location. As a result, Contractors may have no use for this
TCE.
* The project will be staged with demolition of the Columbia Ave Bridge first, followed by
construction of the new Southwest Ave Bridge, then demolition of the old Southwest Ave Bridge
once traffic is transferred to the new structure.
* The billboard on the west side of the tracks is being relocated by others to an area east of the
tracks within the current Columbia ROW. Access to businesses must be maintained throughout
construction.
* At Parcel 6 (5134-5136 Southwest Ave), the plans show the demolition of the larger building,
and the smaller building is marked "DND". The smaller building will need to be demolished as
well, this will be formally issued in an addendum. The building abuts the side of the adjacent
coffee shop building. Once the smaller building is demolished, the coffee shop will have their
own contractor repair the wall. The City's contractor will need to coordinate the scheduled work
with the coffee shop owner.
* Union Pacific Railroad has updated their permitting and flagging operations since the City/UPRR
was originally executed. UPRR no longer provides flaggers and will require the Contractor to
acquire flagging services from one of two UPRR-approved 3rd party companies; Rail Pros or

National Railroad Safety Services (NRSS). The contractor will be responsible for paying the
following railroad costs, with three line items being formally added to the contract with an
upcoming addendum:
Permitting, Contractor Right of Entry, and Railroad Insurance Requirements - Lump sum
o
bid item. The Contractor should include in its lump sum bid price all direct and indirect
costs associated with obtaining required permits, securing rights of entry, and satisfying
railroad insurance requirements.
Flagging - Lump sum bid item. The Contractor should include in its lump sum bid price
o
all direct and indirect costs associated with providing flagging services from a UPRR
approved 3rd party flagging vendor.
Engineering reviews - City will establish a line item with a cost of 250,000 units at
o
$1.00/EA. This bid item is intended as a pass-through allowance to reimburse
contractors for all invoices received from UPRR related to engineering services provided
by UPRR and/or its subconsultant Benesch, including but not limited to project
management, construction submittals and reviews, construction management, on-site
visits, UPRR travel and attendance at pre-construction meeting, and digital observation
(if required by UPRR). This contract amount for this line item will be adjusted, as
necessary, through change order to reflect the actual costs invoiced by and paid to
UPRR.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Brand Name National Stock Numbers: Industry Feedback Request Active Contract Opportunity Notice

GENERAL SERVICES ADMINISTRATION

Bid Due: 2/12/2027

WTP Pipe Gallery Replacement - St. Charles County, MO 25-004 StatusAccepting Bids Prebid

Drexel Technologies

Bid Due: 11/18/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.