SECTION 00 01 01
PROJECT TITLE PAGE
PROJECT MANUAL
FOR
ROWAN COUNTY
130 W. INNES STREET,
SALISBURY, NORTH CAROLINA2 8144
RECYCLING CENTER ROOF REPLACEMENT
1 102 N. LONG STREET,
SALISBURY, N ORTH CAROLINA 28144
REI PROJECT NO. R25CLT-051
ROWAN COUNTY PROJECT NO. 2025-XXX
10-28-2025
PREPARED BY:
1 927 J.N. PEASE PLACE, SUITE 201, CHARLOTTE, NC 28262
N ORTH CAROLINA FIRM LICENSE C-1520
Recycling Center Roof
Replacement
00 01 01 - 1
PROJECT TITLE PAGE
SECTION 00 01 07
SEALS PAGE
PART 1 GENERAL
1.1 SUMMARY
A.
Design Firm for Recycling Center Roof Replacement with Project Manual dated 10-28-2025:
1.
R EI Engineers, Inc., 1 927 J.N. Pease Place, Suite 201, Charlotte, NC 28262.
2.
North Carolina Firm License C-1520
Professional Engineer
Digitally signed by Jeremiah Webster
DN: C=US,
E=jwebster@reiengineers.com, O=REI
Engineers, CN=Jeremiah Webster
Date: 2025.11.04 08:29:51-05'00'
END OF SECTION 00 01 07
Recycling Center Roof
Replacement
00 01 07 - 1
SEALS PAGE
SECTION 00 01 10
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A.
00 01 01 - Project Title Page
B.
00 01 07 - Seals Page
C.
00 01 10 - Table of Contents
D.
00 01 15 - List of Drawings
E.
00 11 13 - Advertisement for Bids
F.
00 21 13 - Instructions to Bidders
G. 00 31 26.23 - Existing Asbestos Information
H.
00 41 13 - Bid Form
I.
0 0 43 13 - Bid Bond Form
J.
00 43 39 - Minority Business Enterprise
K.
00 52 13 - Standard Form of Agreement
L.
00 60 00 - Project Forms
M. 00 61 13.13 - Performance Bond Form
N.
00 61 13.16 - Payment Bond Form
O. 0 0 62 33 - Roof Manufacturer's Acknowledgment
P.
00 62 76.13 - Sales Tax Report
Q. 00 63 13 - Request for Interpretation
R.
00 63 25 - Substitution Request Form
S.
00 63 55 - Change Proposal Form
T.
00 65 36 - Contractor's Warranty
U.
0 0 65 37 - Asbestos Free Warranty
V.
00 73 00 - Supplementary Conditions
Recycling Center Roof
Replacement
00 01 10 - 1
TABLE OF CONTENTS
SPECIFICATIONS
2.1 DIVISION 01 -- GENERAL REQUIREMENTS
A.
0 1 11 00 - Summary of Work
B.
0 1 14 00 - Work Restrictions
C.
01 21 00 - Allowances
D.
01 23 00 - Alternates
E.
01 25 00 - Substitution Procedures
F.
01 26 00 - Contract Modification Procedures
G. 0 1 29 00 - Payment Procedures
H.
0 1 31 00 - Project Management and Coordination
I.
01 33 00 - Submittal Procedures
J.
01 40 00 - Quality Requirements
K.
01 42 00 - Reference Standards
L.
01 50 00 - Temporary Facilities and Controls
M. 0 1 73 00 - Execution Requirements
N.
01 74 00 - Cleaning and Waste Management
O. 01 77 00 - Closeout Procedures
2.2 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A.
07 01 50 - Preparation for Re-Roofing
B.
07 41 13 - Metal Roof Panels
C.
07 42 13 - Metal Wall Panels
D.
07 72 53 - Snow Guards
END OF SECTION 00 01 10
Recycling Center Roof
Replacement
00 01 10 - 2
TABLE OF CONTENTS
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
A.
The following drawings dated 10-28-2025 are included as part of the Contract Documents:
1.
G-001 Cover
2.
XR101 Roof Plan
3.
XR501 Details
4.
XR502 Details
END OF SECTION 00 01 15
Recycling Center Roof
Replacement
00 01 15 - 1
LIST OF DRAWINGS
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.