| Location: | Pennsylvania |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | May 27, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Allentown Parking Authority, Lehigh County |
| Publication URL: | To access bid details, please log in. |
Project Description: Project Description: Project consists of performing full depth repairs to the elevated concrete slab and concrete curbs at levels 2 through 3 for the Base bid and at level 4 for Alternate #1. In addition to concrete slab and curb repairs overhead concrete beam and vertical concrete column/wall spall repairs for Base bid. In addition to the concrete repairs, painting the line striping at the full depth repairs is included in the base bid. The alternate #1 bid also includes the line striping and remove/replace drain.

With GovernmentContracts, you can:
...ASSEMBLY QUAD BEAM 36'' WIDE. APPROVED PRODUCTS ONLY Contact: Steve Curley Email: scurley@septa.org ...
Southeastern Pennsylvania Transportation Authority
Bid Due: 9/21/2026
...concrete footings, laminated wood columns (8-3/4 inches x 15 feet-0 inches), and laminated ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
...inches x 15 feet-0 inches), and laminated wood beams (8-3/4 inches x 15 ...
DEPT OF DEFENSE
Bid Due: 9/21/2026
...), and laminated wood beams (8-3/4 inches x 15 feet-0 inches).This project consists ...
DEPT OF DEFENSE
Bid Due: 9/28/2026