FCI SCHUYLKILL UPGRADE WATER TANK - 25Z2AD8
| Location: |
Pennsylvania |
| Posted: |
Apr 7, 2026 |
| Due: |
Apr 21, 2026 |
| Agency: |
JUSTICE, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- 54 - Prefabricated Structures and Scaffolding
|
| Solicitation No: |
15B21326Q00000003 |
| Publication URL: |
To access bid details, please log in. |
FCI SCHUYLKILL UPGRADE WATER TANK - 25Z2AD8
Active
Contract Opportunity
Notice ID
15B21326Q00000003
Department/Ind. Agency
JUSTICE, DEPARTMENT OF
Sub-tier
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Office
FCI SCHUYLKILL
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Apr 07, 2026 01:13 pm EDT
-
Original Date Offers Due: Apr 21, 2026 04:00 pm EDT
-
Inactive Policy: 15 days after date offers due
-
Original Inactive Date:
May 06, 2026
-
Initiative:
Classification
-
Original Set Aside: No Set aside used
-
Product Service Code: 5430 - STORAGE TANKS
-
NAICS Code:
-
238990 - All Other Specialty Trade Contractors
-
Place of Performance:
Minersville
,
PA
17954
USA
Description
The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Schuylkill located in Minersville, Pennsylvania intends to make a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals to correct the below referenced work on a 500,000 gallon above ground water tank:
-
Perform a dry interior cleanout to remove sediment.
-
Install an anti-vortex plate on the suction line.
-
Install a cable-type safety climb device on the shell ladder.
-
Post a confined space entry sign at the primary roof hatch.
-
Adjust, calibrate, and lubricate the existing liquid level gauge.
-
Install a thermomete on the tank.
-
Replace the PVC overflow pipe with a steel overflow system, complete with standoffs, flapper valve, and screen.
-
Install two (2) open coil element (OCE) heaters.
-
Install sacrificial anodes on the interior shell.
-
Install a lock on the primary roof hatch. (Owner provided lock)
-
Repair cracks and spalling with a commercial non-shrinking grout.
-
Pressure wash the tank exterior with an antifungal solution.
-
Install a fall protection required sign near the base of the shell ladder.
-
Install a frost-proof drain valve complete with a locking device. (Owner provided lock)
-
Replace the bolts on the primary shell manway with maintenance-free galvanized steel bolts.
-
Clean the area around the anchor bolts, tighten the anchor nuts, and tack weld the nuts to the bolts, repaint.
-
Clean the exposed foundation and seal or paint to protect the concrete.
Attachments/Links
Contact Information
Contracting Office Address
-
P.O BOX 700
-
MINERSVILLE , PA 17954
-
USA
Secondary Point of Contact
History
-
Apr 07, 2026 01:13 pm EDTSolicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...of the concrete foundation, footings, and stone base down to subgrade; and the ...
PennBid
Bid Due: 7/07/2026
...hydraulic piping that is embedded in concrete must be drained, cut flush with ...
DEPT OF DEFENSE
Bid Due: 6/18/2026
...bypassing, trench excavation and backfill, construction and installation of precast concrete manholes..., erosion ...
PennBid
Bid Due: 6/29/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.